Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee   3

ID: W912EK22B0003 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

Posted: April 11, 2022, 3:30 p.m. EDT

Amendment 0004 - The reason for this amendment is to update the bid closing date/time from 17 March 2022 at 2:00pm CT to 22 March 2022 at 2:00pm CT.

_____________________________________________________________________________

Amendment 0003 - The reason for this amendment is to revise the schedule of prices, submittal register and following spec sections: 00 73 05, 01 11 00, 01 22 00, 01 57 19, 31 00 00, 31 23 19, 32 32 48 and 33 05 23. Drawing changes include: VOL 103 (C-105 and C-106), VOL 108 (GI005, GC101 and CF305), VOL 109 (GI004, BB103, BB613, CT101 and CT512) and VOL 1110 (CI101). Revisions are a result of contractor questions.

_____________________________________________________________________________

Amendment 0002 - The reason for this amendment is to update the bid closing date/time from 03 March 2022 at 2:00pm CT to 17 March 2022 at 2:00pm CT.

_____________________________________________________________________________

Amendment 0001 - The reason for this amendment is to update the contract completion days from 270 to 365 consecutive calendar days under Block 10 and 11 of the Standard Form 1442 to match FAR Clause 52.211-10 and extend the ProjNet Q&A period from 21 February 2022 at 2:00pm CT to 22 February 2022 at 2:00pm CT.

_____________________________________________________________________________

McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.

McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.

McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.

Posted: March 11, 2022, 1:41 p.m. EST
Posted: March 10, 2022, 4:22 p.m. EST
Posted: Feb. 23, 2022, 7:22 p.m. EST
Posted: Feb. 16, 2022, 3:52 p.m. EST
Posted: Feb. 2, 2022, 6:21 p.m. EST
Background
The Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts, and Levee is a construction project issued by the US Army Corps of Engineers. The project aims to mitigate flood risks in the area by implementing various construction tasks such as demolition, temporary traffic control, clearing, grubbing and stripping, channel excavation, filling and grading, riprap and bedding stone placement, trail construction, site restoration, landscaping, access roadway improvements, dewatering, earthwork, excavation and fill, structural concrete construction, trenchless steel pipe installation, sheet pile installation, levee embankment construction, toe drain installation.

Work Details
The work includes a variety of construction tasks such as demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; landscaping for McLoud Run Lower Reach Channel (BASE). Additionally, it involves access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; landscaping for McLoud Run Lower Reach Culverts (OPTION A). Furthermore, it encompasses site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; landscaping for McLoud Run Lower Reach Levee (OPTION B).

Place of Performance
The geographic location for the construction projects is Cedar Rapids.

Overview

Response Deadline
March 22, 2022, 3:00 p.m. EDT (original: March 3, 2022, 3:00 p.m. EST) Past Due
Posted
Feb. 2, 2022, 6:21 p.m. EST (updated: April 11, 2022, 3:30 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Cedar Rapids, IA United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
78% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 2/2/22 USACE Rock Island District issued Solicitation W912EK22B0003 for Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee due 3/22/22. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1QA.
Primary Contact
Name
Bradley Grothus   Profile
Phone
None

Secondary Contact

Name
Elizabeth Dennison   Profile
Phone
(309) 794-5293

Documents

Posted documents for Solicitation W912EK22B0003

Opportunity Assistant

Opportunity Lifecycle

Procurement notices related to Solicitation W912EK22B0003

Award Notifications

Agency published notification of awards for Solicitation W912EK22B0003

Contract Awards

Prime contracts awarded through Solicitation W912EK22B0003

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912EK22B0003

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912EK22B0003

Experts for Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > MVD > W07V ENDIST ROCK ISLAND
FPDS Organization Code
2100-W912EK
Source Organization Code
100221368
Last Updated
April 29, 2022
Last Updated By
natalie.e.werthmann@usace.army.mil
Archive Date
April 29, 2022