Search Contract Opportunities

CA FTNP SEKI 13(2) Mineral King Road   4

ID: 6982AF24B000017 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Sept. 18, 2024, 3:00 p.m. EDT

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Full and Open Competition with HUBZone price preference

PROJECT NUMBER: CA FTNP SEKI 13(2)

PROJECT NAME: MINERAL KING ROAD

PROJECT DESCRIPTION:

The project proposes to rehabilitate up to 15.20 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA.

SCOPE OF THE WORK:

The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures.

The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service.

PRINCIPAL WORK ITEMS:

22,500 LF Ditch Excavation

1,900 CY Rip Rap

700 CY Special Rock Embankment

1800 SF Soil Nail Retaining Wall

6,500 Tons Roadway Aggregate, Method 2

7.5 Miles Full Depth Reclamation, Method 2

4.5 Miles Full Depth Reclamation, Method 2 with Cement

26,000 Tons Asphalt Pavement

380 LF Steel H Piles, In Place

9,800 LF 24 to 48 Culverts

70 Each Inlet (Concrete Box Inlet)

37,000 LF Paved Ditch, Asphalt

80 Each Dry Stacked Headwall

ANTICIPATED SCHEDULE:

Pre Bid Site Visit Onsite Meeting October 2024. See attachment for details.

Advertisement September 2024

Construction April 2025 through October 2027

ESTIMATED COST RANGE:

Between $25,000,000 and $35,000,000

Posted: Sept. 9, 2024, 5:07 p.m. EDT
Background
The project is issued by the National Park Service, specifically for the rehabilitation of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The goal of the contract is to improve access for visitors while maintaining environmental sensitivity in a remote mountainous terrain.

Work Details
The scope of work includes pulverization of existing pavement, aggregate base placement, and asphalt paving of the roadway. Rehabilitation or paving of parking lots to enhance visitor access is also included.

Construction tasks involve building soldier pile walls, soil nail walls, and special rock embankments for roadway stabilization. Additionally, drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures are part of the project.

Principal work items include:
- 22,500 LF Ditch Excavation
- 1,900 CY Rip Rap
- 700 CY Special Rock Embankment
- 1,800 SF Soil Nail Retaining Wall
- 6,500 Tons Roadway Aggregate, Method 2
- 7.5 Miles Full Depth Reclamation, Method 2
- 4.5 Miles Full Depth Reclamation, Method 2 with Cement
- 26,000 Tons Asphalt Pavement
- 380 LF Steel H Piles in Place
- 9,800 LF Culverts (24” to 48”)
- 70 Each Concrete Box Inlets
- 37,000 LF Paved Ditch (Asphalt).

Period of Performance
Construction is anticipated to occur from April 2025 through October 2027.

Place of Performance
The construction projects will be performed along Mineral King Road in Tulare County, California.

Overview

Response Deadline
Sept. 24, 2024, 4:00 p.m. EDT Past Due
Posted
Sept. 9, 2024, 5:07 p.m. EDT (updated: Sept. 18, 2024, 3:00 p.m. EDT)
Set Aside
None
Place of Performance
CA United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$20,000,000 - $40,000,000 (AI estimate)
Odds of Award
90%
On 9/9/24 Central Federal Lands Highway Division issued Presolicitation 6982AF24B000017 for CA FTNP SEKI 13(2) Mineral King Road due 9/24/24. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Jorey Deml   Profile
Phone
None

Secondary Contact

Name
Ryan Phillips   Profile
Phone
None

Documents

Posted documents for Presolicitation 6982AF24B000017

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation 6982AF24B000017

Award Notifications

Agency published notification of awards for Presolicitation 6982AF24B000017

Contract Awards

Prime contracts awarded through Presolicitation 6982AF24B000017

Incumbent or Similar Awards

Contracts Similar to Presolicitation 6982AF24B000017

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 6982AF24B000017

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 6982AF24B000017

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Oct. 9, 2024
Last Updated By
jorey.deml@dot.gov
Archive Date
Oct. 9, 2024