Search Contract Opportunities

Building 463 Breakroom Renovation at Kirtland AFB

ID: W912PP26QA039 • Type: Award Notice • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 463 Breakroom Renovation and Entry Repair

  1. Demolition
    1. Contractor must remove existing flooring and rubber wall base.
    2. Contractor must remove existing casework and countertop.
    3. Contractor must remove existing plumbing fixtures and refrigerator.
    4. Contractor must remove existing picnic tables and salvage for reinstallation.
    5. Contractor must remove existing cracked and buckled concrete pads and sidewalks.
  2. Construction
    1. Contractor must provide and install new flooring and rubber wall base.
    2. Contractor must provide and install new plastic laminate casework.
    3. Contractor must provide and install new solid surface countertops.
    4. Contractor must provide and install new plumbing fixtures.
    5. Contractor must provide and install new microwave.
    6. Contractor must provide and install new refrigerator.
    7. Contractor must provide and install new refrigerator in Building 442 kitchen.
    8. Contractor must provide and install new water line for refrigerator.
    9. Contractor must provide and install new sprinkler system with bubblers, piping, sprinkler valve and timer to provide irrigation to four courtyard trees.
    10. Contractor must compact and prepare sub grade for new concrete pads and sidewalk. Trim and cut back existing roots as needed.
    11. Contractor must provide and install new concrete pads and sidewalks. Provide steel mesh concrete reinforcement and control joints.
    12. Contractor must reinstall picnic tables.

Overview

Awardee
Award ID
W912PP26PA027
Reported Award
$145,121
Award Date
Posted
Set Aside
8(a) Sole Source (8AN)
Place of Performance
Kirtland AFB, NM 87117 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Sole Source
Signs of Shaping
70% of obligations for similar contracts within the Department of the Army were awarded full & open.
Building 463 Breakroom Renovation at Kirtland AFB (W912PP26QA039) was awarded to Colt Builders on 9/10/26 by USACE Albuquerque District.
Primary Contact
Name
Glenda D. Kohlieber   Profile
Phone
5754796095102

Documents

Posted documents for Award Notice W912PP26QA039

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Award Notifications

Agency published notification of awards for Award Notice W912PP26QA039

Similar Active Opportunities

Open contract opportunities similar to Award Notice W912PP26QA039

Experts for Building 463 Breakroom Renovation at Kirtland AFB

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > W075 ENDIST ALBUQUERQUE
FPDS Organization Code
2100-W912PP
Source Organization Code
100221490
Last Updated
Last Updated By
glenda.d.kohlieber@usace.army.mil
Archive Date