Search Contract Opportunities

BSNP FY19 Flood Repairs - MO River Navagation Structures   3

ID: W912DQ21B1011 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Construction activies to repair structural damage on the Missouri River caused by the FY19 Flood Event between River Miles 0-280.

Background
The contract involves construction activities to repair structural damage on the Missouri River caused by the FY19 Flood Event between River Miles 0-280. The work includes repairing dikes and revetments on the Missouri River. The work in each area under CLIN 0001 is described in Items 1 through 14. The work in each under CLIN 0002 is described in items 15 through 28. The work in each area under CLIN 0003 is described in items 29 through 42. The work in each area under CLIN 0004 is described in items 43 through 56. The work in each area under CLIN 00005 is described in items 57 through 70.
Repairs consist of placing new stone on existing structures.

Work Details
The contractor shall provide labor, supervision, materials, and equipment to complete placement of stone totaling 309,900 tons between RM 0-280. Additionally, there are options for placement of additional tons of stone totaling 78,100, 46,100, and 120,100 tons respectively. The contractor will be required to place 180,000 tons of stone no later than 270 days after Notice to Proceed.

Period of Performance
The completion period for the contract is specified as follows: CLINs 0001-0003 must be completed within 600 days after notice to proceed (ANP), while CLINs 0004-0005 have a completion period of an additional 180 days if exercised. The delivery dates for each CLIN range from 600 to 780 days ANP.

Place of Performance
The construction projects will be performed along the Missouri River between River Miles (RM) 0-280.

Overview

Response Deadline
April 13, 2021, 3:00 p.m. EDT Past Due
Posted
March 12, 2021, 2:33 p.m. EST (updated: April 14, 2021, 4:52 p.m. EDT)
Set Aside
None
Place of Performance
United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 3/12/21 USACE Kansas City District issued Solicitation W912DQ21B1011 for BSNP FY19 Flood Repairs - MO River Navagation Structures due 4/13/21. The opportunity was issued full & open with NAICS 237990 and PSC Z2PZ.
Primary Contact
Name
Laura L Hedrick   Profile
Phone
(816) 389-3023

Secondary Contact

Name
David M. Best   Profile
Phone
(816) 389-3404

Documents

Posted documents for Solicitation W912DQ21B1011

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W912DQ21B1011

Award Notifications

Agency published notification of awards for Solicitation W912DQ21B1011

Contract Awards

Prime contracts awarded through Solicitation W912DQ21B1011

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912DQ21B1011

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912DQ21B1011

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NWD > W071 ENDIST KANSAS CITY
FPDS Organization Code
2100-W912DQ
Source Organization Code
100255257
Last Updated
June 1, 2021
Last Updated By
laura.l.hedrick@usace.army.mil
Archive Date
June 1, 2021