Search Contract Opportunities

Bean Backfill CMc - Synopsis   3

ID: 47PF0020R0026 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

This project is for the renovation of 160,000 to 200,000 square feet, on the 1st and 2nd floors, to meet the needs of new customers who will be relocating to the building, in addition to relocating existing tenants within the building. Currently, Customs and Border Protection (CBP) and U.S. Marine Corps (USMC) will ultimately occupy the majority of this square footage. The proposed construction spaces will be vacant; however, the building will be occupied by other tenants during the work performance period(s). Hazardous material abatement/remediation will be required as part of these renovations.

The project scope includes:

The overall responsibilities of the CMc are to perform construction management services relating to constructability, construction strategy, logistics, and budget control during the Design Stage services component, and (upon exercise of the Construction Stage work option) to perform the construction in accordance with the construction documents and other requirements under the Construction Stage work component.

Design Stage Base Services

  1. Collaboration with Architect/Engineering Firm, the Construction Manager as Agent (CMa), and other parties hired by GSA to perform specialized duties and requirements as appropriate for this project during any stage.
  2. Project Initiation Meetings
  3. Risk Management Workshops
  4. Design Submission Reviews
  5. Building Information Modeling(BIM)
  6. Value Management
  7. Historic Consultation Meetings
  8. Constructability Reviews
  9. Cost Estimating, Reconciliation, and Proposed Alternatives (CERPA)
  10. Preliminary Project Schedule and Analysis
  11. Construction Work Sequencing and Phasing Plan
  12. Electronic Project Management (ePM)

Option 1 - Construction Stage (Including TurnOver and Closeout)

  1. Selective demolition including removal of walls, ceilings, and floors
  2. Necessary mechanical, electrical, and plumbing demolition.
  3. Necessary asbestos and Lead Based Paint (LBP) paint abatement work.
  4. New Detention Cell Block
  5. New floor layout
  6. HVAC system modifications
  7. New Plumbing
  8. New Lighting
  9. Millwork
  10. Etc.

The contract completion time for this project is nine hundred and fifty-three (953) calendar days from receipt of notice to proceed. The estimated cost range is more than $10M. This is negotiated, best value procurement.

The contractor is to provide all management, supervision, manpower, equipment and supplies necessary for this project. The proposed contract is being solicited as full and open competition. The Request for Proposal will be issued on or about April or May of 2020.

The solicitation cited above can only be obtained by accessing a secure website known as beta.SAM.gov (The System for Award Management). This is a secure website designed to safeguard sensitive but unclassified (SBU) acquisition information. In order to obtain information from beta.SAM.gov, you will first be required to register with SAM. All government contractors must be registered in SAM prior to receiving an award. You may access SAM at the following URL:

beta.SAM.gov

Any questions regarding this notification should be directed to the Contracting Specialist and Contracting Officer whose name(s) appears herein. Potential offerors will be responsible for downloading the solicitation and monitoring the website for amendments, if any, to the solicitation.

Overview

Response Deadline
May 10, 2020, 2:00 p.m. EDT Past Due
Posted
March 25, 2020, 12:17 p.m. EDT
Set Aside
None
Place of Performance
Indianapolis, IN 46249 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Odds of Award
57%
On 3/25/20 PBS Region 5: Great Lakes Region issued Presolicitation 47PF0020R0026 for Bean Backfill CMc - Synopsis due 5/10/20. The opportunity was issued full & open with NAICS 236220 and PSC Z2AA.
Primary Contact
Name
Matthew Nelson   Profile
Phone
(347) 244-5147

Secondary Contact

Name
Jennifer E. Styzek   Profile
Phone
(312) 353-1214

Documents

Posted documents for Presolicitation 47PF0020R0026

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation 47PF0020R0026

Contract Awards

Prime contracts awarded through Presolicitation 47PF0020R0026

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 47PF0020R0026

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 47PF0020R0026

Additional Details

Source Agency Hierarchy
GENERAL SERVICES ADMINISTRATION > PUBLIC BUILDINGS SERVICE > PBS R5
FPDS Organization Code
4740-47PF00
Source Organization Code
100170348
Last Updated
May 25, 2020
Last Updated By
PI33_DR_IAE_51681
Archive Date
May 25, 2020