Search Contract Opportunities

AZ FLAP SR88(1) Apache Trail   4

ID: 6982AF21B000027 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Project Location

The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam (MP 240) and Apache Lake Marina (MP 229) in Maricopa County, Arizona. State Route 88 is currently closed south of the project due to flood damage. Access for construction will be from the north. The figure below provides a visual summary of the project location.

Scope of the Work

The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved. The project does not propose widening. Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation.

Items worth noting:

  • This is a very narrow and winding section of road with steep grades and no shoulder in several locations. Coordination with public traffic will be required. Daytime delays will be a maximum of 15 minutes.
  • Several drainage structures are currently completely plugged and the bench in portions of the project has been narrowed due to flood events in the Fall of 2019.
  • State Route 88 south of the Apache Lake Marina is currently closed. ADOT has not indicated a timeline for reopening this segment and it therefore the project should not be assumed to be accessible from the south.
  • One slope cut will likely require blasting techniques to excavate hard rock.
  • The road has historic characteristics that will require archeological monitors for certain work items. Additionally, environmental resources exist adjacent to the road in several locations.

Principal Work Items

Approximate quantities for major work items:

  • 16,000 cubic yards of roadway excavation
  • 5,150 cubic yards of rip rap
  • 111,000 square yards of chip seal
  • 38,000 tons of roadway aggregate
  • 6,200 tons of asphalt concrete pavement
  • 3,000 square yards of concrete pavement (low water crossings with cutoff walls)
  • 1,700 linear feet of pipe culvert
  • 465 linear feet of reinforced concrete box culvert

Anticipated Schedule

Advertise: Late October

Bid Opening: Early December

Award: Late December

Construction: Winter 2022 Fall 2022

Funding

The anticipated cost range is between $12,000,000 and $16,000,000.

Background
The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam and Apache Lake Marina in Maricopa County, Arizona. The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will be surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved.

Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation.

Work Details
The principal work items include approximately 16,000 cubic yards of roadway excavation, 5,150 cubic yards of rip rap, 111,000 square yards of chip seal, 38,000 tons of roadway aggregate, 6,200 tons of asphalt concrete pavement, 3,000 square yards of concrete pavement (low water crossings with cutoff walls), 1,700 linear feet of pipe culvert, and 465 linear feet of reinforced concrete box culvert.

Period of Performance
Winter 2022 – Fall 2022

Place of Performance
Maricopa County, Arizona

Overview

Response Deadline
Dec. 1, 2021, 4:00 p.m. EST Past Due
Posted
Oct. 25, 2021, 8:04 p.m. EDT (updated: June 14, 2022, 5:51 p.m. EDT)
Set Aside
None
Place of Performance
Roosevelt, AZ United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
On 10/25/21 Central Federal Lands Highway Division issued Solicitation 6982AF21B000027 for AZ FLAP SR88(1) Apache Trail due 12/1/21. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Eric Grosskreuz   Profile
Phone
None

Secondary Contact

Name
Sheri Walsh   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF21B000027

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF21B000027

Award Notifications

Agency published notification of awards for Solicitation 6982AF21B000027

Contract Awards

Prime contracts awarded through Solicitation 6982AF21B000027

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF21B000027

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF21B000027

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
June 14, 2022
Last Updated By
sheri.walsh@dot.gov
Archive Date
Feb. 15, 2022