Search Contract Opportunities

Az/Ca Ftbr Lcd Pada(1) - Parker Dam Road   4

ID: 6982AF23B000034 • Type: Presolicitation

Description

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE

PROJECT NUMBER: AZ/CA FTBR LCD PADA(1)

PROJECT NAME: PARKER DAM ROAD

PROJECT DESCRIPTION: This project includes pavement resurfacing, restoration, and rehabilitation along Parker Dam Road, Power House Road, an Access Road and six parking lots within the project limits, including a Bureau of Reclamation (BOR) maintenance yard parking lot. The project is located straddling the border of California and Arizona near the city of Parker, AZ. Timely completion of construction will be crucial to minimize impact on the commuter traffic.

SCOPE OF THE WORK: Proposed improvements include pavement over full depth reclamation of the existing 11-foot driving lanes and 1-foot shoulders on each side excluding across the dam. The project begins on the west side of the dam (at the south end of the eastern leg of the intersection triangle) at MWD Road, work is suspended just south of the western end of the dam, resumes just south of the eastern end of the dam, and ends at the southeast intersection with Takeoff Point Road. The parking lot improvements include fog seal treatment for the BOR maintenance yard parking lot and full depth reclamation for the remaining 5 parking lots. The total project length is approximately 0.78 miles. The weight limit across the dam is 9 tons/axle. Concrete trucks and most heavy construction vehicles might not be able to drive of the dam.

PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include:

  • 16,650 square yards of Full Depth Reclamation, Method 2, 8-inch depth
  • 3,700 tons of Asphalt Concrete Pavement, Type 1
  • 400 cubic yards of Subexcavation
  • 1,600 linear feet of Guardrail Systems MGS, Type 3, Class A Steel Posts
  • 6 miles of pavement markings

The estimated price range of the project work is between $2,000,000 and $5,000,000.

Overview

Response Deadline
Sept. 19, 2023, 2:00 p.m. EDT Past Due
Posted
Sept. 5, 2023, 4:10 p.m. EDT
Set Aside
Small Business (SBA)
Place of Performance
AZ United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Odds of Award
90%
Signs of Shaping
71% of obligations for similar contracts within the Federal Highway Administration were awarded full & open.
On 9/5/23 Central Federal Lands Highway Division issued Presolicitation 6982AF23B000034 for Az/Ca Ftbr Lcd Pada(1) - Parker Dam Road due 9/19/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237310 (SBA Size Standard $45 Million) and PSC Y1LB.
Primary Contact
Name
Kelly Palmer   Profile
Phone
(720) 963-3500

Documents

Posted documents for Presolicitation 6982AF23B000034

Question & Answer

Opportunity Lifecycle

Procurement notices related to Presolicitation 6982AF23B000034

Award Notifications

Agency published notification of awards for Presolicitation 6982AF23B000034

Incumbent or Similar Awards

Contracts Similar to Presolicitation 6982AF23B000034

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 6982AF23B000034

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 6982AF23B000034

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Oct. 4, 2023
Last Updated By
kelly.palmer@dot.gov
Archive Date
Oct. 4, 2023