Search Contract Opportunities

Augmented Reality Enhanced Corrosion Control Systems

ID: AF241-D017 • Type: SBIR / STTR Topic • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Integrated Sensing and Cyber OBJECTIVE: To develop an integrated suite of Augmented Reality (AR) technology to address Corrosion Control DESCRIPTION: Aircraft maintenance maintainers have identified an opportunity to increase efficiency, lower cost, and increase safety of Corrosion Control professionals by enhancing existing corrosion control detection and measurement systems with wearable Commercial-Off-the-Shelf Augmented Reality technology to provide data as a visual overlay within the user's field of view, tag measurement data in Three Dimensional Space to specific aircraft, save data for future use and users, and export data and live video to additional users and digital twins. Aircraft maintainers envision enhancement of two systems: one which measures the thickness of paint on a metal or composite substrate and one which serves as an Eddy Current Non-destructive Testing system. Corrosion Control professionals use a variety of systems (e.g., Eddy Current, Ultrasound, X-ray) to detect problems, but these systems do not share a common interface, cannot save results associated to a particular aircraft, and can be unwieldy to handle while scanning and recording results manually. Most systems cannot export data; they only show video on other monitors. There is limited ability for remote experts to support maintainers without traveling to site. Aircraft maintainers estimate an AR-integrated Paint Scanning system would increase aircraft maintenance production efficiency by 15-25% and throughput of additional aircraft per year per system to a similar degree, directly improving readiness of aircraft fleet. The NDI Eddy Current integrated system is estimated to deliver 15-25% increase in efficiency, 10% or more improvement in detection accuracy, 10% or more improvement in end user safety, and cost savings. Aircraft maintainers' grand vision for such an integration approach is to arm the maintainer, supervisors, and quality personnel with a suite of AR-enabled corrosion control detection and measurement systems, each with data associated to the aircraft tail number and available at all times for review through the AR headset, enabling an unparalleled capability to toggle through data to fully understand the current and historical corrosion profile of the individual aircraft as well as inform larger analyses of recurring issues and corrosion trends across the fleet. PHASE I: FEASABILITY DOCUMENTATION. For this Direct-to-Phase II topic, evaluators are expecting that the submittal firm demonstrate the ability to have proven feasibility of importing data (not just video) from multiple detection systems into an AR platform, present data, and store data. PHASE II: Contractor will integrate a minimum of three Corrosion Control systems with a single AR platform, tag scan data in 3D space to a particular tail number, enable features by user type (maintainer, supervisor, etc.), and toggle through results without rebooting or reorienting the system. User interface will be simple and intuitive. Applications will share a common look and feel. Data will be exported to a digital twin on a phone, tablet, and/or PC. Live data from the AR system can be shared with other users. AR platform displays data for entire aircraft, not individual parts. PHASE III DUAL USE APPLICATIONS: Contractor will operationalize the Phase II prototype, obtaining Authority to Operate, developing an API or Plug-in to allow additional Corrosion Control system integrations, productizing AR and enabling components into a kit and obtaining National Stock Number(s), and offering sustainment options. Contractor will integrate additional Corrosion Control systems. AR platform can show scans for individual parts. REFERENCES: AFRL-RX-WP-TR-2008-4373 RECOMMENDED PROCESSES AND BEST PRACTICES FOR NONDESTRUCTIVE INSPECTION (NDI) OF SAFETY-OF-FLIGHT STRUCTURES, John Brausch, Lawrence Butkus, David Campbell, Tommy Mullis, and Michael Paulk; Ladwig P., Geiger C. (2019) A Literature Review on Collaboration in Mixed Reality. In: Auer M., Langmann R. (eds) Smart Industry & Smart Education. REV 2018. Lecture Notes in Networks and Systems, vol 47. Springer, Cham. https://doi.org/10.1007/978-3-319-95678-7_65; Brown, L.J.: Professional reflection mixed reality to augment the next generation of aviation professionals. In: Kearns, S.K., Mavin, T.J., Hodge, S. (eds.) Engaging the Next Generation of Aviation Professionals, pp. 163 180. Routledge, New York, NY (2020); KEYWORDS: Augmented Reality; Non-destructive Inspection; Corrosion Control

Overview

Response Deadline
Feb. 7, 2024 Past Due
Posted
Nov. 29, 2023
Open
Jan. 3, 2024
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I / II
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Phase II: Continue the R/R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Typically, only Phase I awardees are eligible for a Phase II award
Duration
6 Months - 1 Year
Size Limit
500 Employees
On 11/29/23 Department of the Air Force issued SBIR / STTR Topic AF241-D017 for Augmented Reality Enhanced Corrosion Control Systems due 2/7/24.

Documents

Posted documents for SBIR / STTR Topic AF241-D017

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic AF241-D017

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic AF241-D017

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic AF241-D017