Search Contract Opportunities

AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.   3

ID: 69056725B000001 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

PROJECT: AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine Access Facility Jct.

LOCATION: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales Island, Alaska

WORK: Work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. See Project Description posted under attachments for additional details.

LENGTH:

Schedule A 1.6 miles of road reconstruction

Schedule B 2.0 miles of road reconstruction

Schedule C 2.4 miles of road reconstruction

TENTATIVE COMPLETION DATE: Fall 2026

CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price

ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000

INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.

THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

This project is anticipated to be solicited Winter 2024/2025

This project will include 3 bid schedules. Only one schedule will be awarded.

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the follow button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.

Background
The project, AK PFH 58(1), involves the reconstruction of Neck Lake Road from NPOWI Highway to the Marine Access Facility Junction. It is managed by the Western Federal Lands Highway Division, which operates under the mission to improve and maintain transportation infrastructure in federal lands.

The goal of this contract is to enhance road access and safety on Prince of Wales Island, Alaska.

Work Details
The work includes a variety of construction tasks such as: roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery construction, drainage installation (including large Aquatic Organism Pipes), embankment work (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control measures, temporary traffic control setup, permanent signage installation, and turf establishment.

The project will be divided into three bid schedules with varying lengths of road reconstruction:
- Schedule A - 1.6 miles;
- Schedule B - 2.0 miles;
- Schedule C - 2.4 miles.

Period of Performance
The contract is anticipated to be completed by Fall 2026.

Place of Performance
The construction projects will take place on Prince of Wales Island in the Hyder Census Area of Alaska, approximately 45 miles NW of Coffman Cove.

Overview

Response Deadline
None
Posted
Sept. 25, 2024, 5:28 p.m. EDT
Set Aside
None
Place of Performance
Coffman Cove, AK United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$10,000,000 - $20,000,000 (value based on agency estimated range)
Odds of Award
81%
On 9/25/24 Western Federal Lands Highway Division issued Presolicitation 69056725B000001 for AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Contracts G. Office   Profile
Phone
(360) 619-7520

Additional Contacts in Documents

Title Name Email Phone
None None spec@dot.gov None

Documents

Posted documents for Presolicitation 69056725B000001

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation 69056725B000001

Award Notifications

Agency published notification of awards for Presolicitation 69056725B000001

Contract Awards

Prime contracts awarded through Presolicitation 69056725B000001

Incumbent or Similar Awards

Contracts Similar to Presolicitation 69056725B000001

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 69056725B000001

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 69056725B000001

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 690567 WESTERN FEDERAL LANDS DIV
FPDS Organization Code
6925-00070
Source Organization Code
100163919
Last Updated
Sept. 25, 2024
Last Updated By
rebekah.webb@dot.gov
Archive Date
Sept. 25, 2026