AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.   3

ID: 69056725B000001 • Type: Solicitation

Description

Posted: Jan. 15, 2025, 2:09 p.m. EST

UPDATE 11/19/2024: Physical data files updated af05801_SEGMENT1_proposed-alignment.pdf and af05801_SEGMENT1_proposed-profile.pdf. Physical data file added- af05801_XS_Labeled_SchA.pdf.

PROJECT: AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine Access Facility Jct.
LOCATION: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales Island, Alaska
WORK: Work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. See Project Description for additional details

LENGTH:
Schedule A 1.6 miles of road reconstruction
Schedule B 2.0 miles of road reconstruction
Schedule C 2.4 miles of road reconstruction

TENTATIVE COMPLETION DATE: Fall 2026

CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price

ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000

INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.

THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS

This project is anticipated to be solicited Winter 2024/2025

This project will include 3 bid schedules. Only one schedule will be awarded.

Posted: Jan. 14, 2025, 6:00 p.m. EST
Posted: Jan. 14, 2025, 5:54 p.m. EST
Posted: Jan. 8, 2025, 1:25 p.m. EST
Posted: Jan. 7, 2025, 5:24 p.m. EST
Posted: Jan. 3, 2025, 3:56 p.m. EST
Posted: Jan. 2, 2025, 3:46 p.m. EST
Posted: Dec. 30, 2024, 5:10 p.m. EST
Posted: Dec. 18, 2024, 6:41 p.m. EST
Posted: Dec. 16, 2024, 5:20 p.m. EST
Posted: Dec. 13, 2024, 5:32 p.m. EST
Posted: Dec. 10, 2024, 6:46 p.m. EST
Posted: Dec. 6, 2024, 2:23 p.m. EST
Posted: Dec. 6, 2024, 12:26 p.m. EST
Posted: Nov. 26, 2024, 7:36 p.m. EST
Posted: Nov. 19, 2024, 1:38 p.m. EST
Posted: Nov. 18, 2024, 7:58 p.m. EST
Background
The project titled AK PFH 58(1) involves the reconstruction of Neck Lake Road from NPOWI Highway to the Marine Access Facility Junction. It is located approximately 45 miles northwest of Coffman Cove in the Hyder Census Area on Prince of Wales Island, Alaska. The goal of this contract is to improve roadway infrastructure to enhance access and safety for local communities and facilitate transportation.

Work Details
The scope of work includes various construction tasks such as:
- Roadway excavation
- Sub-excavation
- Soft ground embankment construction (surcharge)
- Grading
- Rock blasting
- Riprap placement
- Rockery installation
- Drainage improvements, including large Aquatic Organism Pipes
- Embankment construction with settlement monitoring
- Placement of aggregate surface course
- Guardrail installation
- Erosion control measures
- Temporary traffic control setups
- Permanent signage installation
- Turf establishment.

The project consists of three bid schedules:
1. Schedule A – 1.6 miles of road reconstruction.
2. Schedule B – 2.0 miles of road reconstruction.
3. Schedule C – 2.4 miles of road reconstruction.

Period of Performance
The anticipated period for performance is expected to extend until Fall 2026.

Place of Performance
The construction projects will be performed on Neck Lake Road, located in the Hyder Census Area, Prince of Wales Island, Alaska.

Overview

Response Deadline
Jan. 14, 2025, 4:00 p.m. EST (original: Dec. 18, 2024, 5:00 p.m. EST) Past Due
Posted
Nov. 18, 2024, 7:58 p.m. EST (updated: Jan. 15, 2025, 2:09 p.m. EST)
Set Aside
None
Place of Performance
Coffman Cove, AK United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$10,000,000 (value based on agency estimated range)
On 11/18/24 Western Federal Lands Highway Division issued Solicitation 69056725B000001 for AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. due 1/14/25. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Contracts G. Office   Profile
Phone
(360) 619-7520

Documents

Posted documents for Solicitation 69056725B000001

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 69056725B000001

Award Notifications

Agency published notification of awards for Solicitation 69056725B000001

Contract Awards

Prime contracts awarded through Solicitation 69056725B000001

Incumbent or Similar Awards

Contracts Similar to Solicitation 69056725B000001

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 69056725B000001

Similar Active Opportunities

Open contract opportunities similar to Solicitation 69056725B000001

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 690567 WESTERN FEDERAL LANDS DIV
FPDS Organization Code
6925-00070
Source Organization Code
100163919
Last Updated
March 31, 2025
Last Updated By
robert.kolln@dot.gov
Archive Date
March 31, 2025