Air pollution control technologies for urban small sources
ID: 2B • Type: SBIR / STTR Topic
• Match:
100%
Opportunity Assistant
Loading
This opportunity is a topic area under the Small Business Innovation Research / Small Business Technology Transfer (SBIR/STTR). Please see the source for documents.
Overview
Response Deadline
Aug. 23, 2023
Past Due
Posted
June 28, 2023
Open
June 28, 2023
Set Aside
Small Business (SBA)
PSC
Place of Performance
Not Provided
Source
Alt Source
Program
SBIR
Phase I
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Duration
6 Months
Size Limit
500 Employees
On 6/28/23 Environmental Protection Agency issued SBIR / STTR Topic 2B for Air pollution control technologies for urban small sources due 8/23/23.
Documents
Posted documents for SBIR / STTR Topic 2B
Question & Answer
The AI Q&A Assistant has moved to the bottom right of the page