This is a Sources Sought Notice only. This is NOT a Request for Proposal or Request for Quote. No Solicitation Number has been assigned at this time. DLA Troop Support is seeking to identify possible sources who can supply the below item:
 ADAPTER, AMPLIFIER
  RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
 RD002, COVERED DEFENSE INFORMATION APPLIES
 RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
 (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
 DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
 AT:
 http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
 FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
 SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
 ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
 APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
 REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
  RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
 RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
  MIL-STD-130N(1) DATED 16 NOV 2012.
 IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY
 THIS IS A SOURCE CONTROLLED ITEM WHICH MUST BE
 MANUFACTURED AND TESTED IN ACCORDANCE WITH THE
 CITED LIMITED RIGHTS DATA. THE GOVERNMENT CAN-
 NOT PROVIDE THE DATA. ONLY THOSE VENDORS WHO
 HAVE ACCESS TO THE DATA OR CAN PROVIDE TRACE-
 ABILITY TO THE APPROVED SOURCES SHOULD QUOTE.
 SAR PACKAGE IS REQUIRED IF YOUR COMPANY IS
 CONSIDERING SOURCE APPROVAL.
  SAMPLING:
 THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
 H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
 SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
 STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
 AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
 VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
 ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
 SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
 MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
 PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
 SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
 UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
 RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
 (MANUFACTURERS AND NON-MANUFACTURERS)
  RQ032: EXPORT CONTROL OF TECHNICAL DATA
 This item has technical data some or all of which is subject to
 export-control of either the International Traffic in Arms regulations
 (ITAR) or the Export Administration Regulations (EAR), and cannot be
 exported without prior authorization from either the Department of State
 or the Department of Commerce. Export includes disclosure of technical
 data to foreign persons and nationals whether located in the United
 States or abroad. This requirement applies equally to foreign national
 employees and U.S. companies and their foreign subsidiaries. DFARS
 252.225-7048 is applicable to this data.
 The Defense Logistics Agency (DLA) limits distribution of export-control
 technical data to DLA contractors that have an approved US/Canada Joint
 Certification Program (JCP) certification, have completed the
 Introduction to Proper Handling of DOD Export-Controlled Technical Data
 Training and the DLA Export-Controlled Technical Data Questionnaire
 (both are available at the web address given below), and have been
 approved by the DLA controlling authority to access the
 export-controlled data. Instructions for obtaining access to the
 export-controlled data can be found at:
 https://www.dla.mil/Logistics-Operations/Enhanced-Validation/
 To be eligible for award, offerors and any sources of supply proposed
 for use are required to have an approved JCP certification and have
 been approved by the DLA controlling authority to access
 export-controlled data managed by DLA. DLA will not delay award in
 order for an offeror or its supplier to apply for and receive approval
 by the DLA controlling authority to access the export-controlled data.
  RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
 RQ003: CONFIGURATION CHANGE MANAGEMENT FOR EDGEWOOD FOR CHEMICAL,
 BIOLOGICAL CENTER MATERIALS - ENGINEERING CHANGE PROPOSAL REQUEST FOR
 VARIANCE (DEVIATION OR WAIVER)
 This material will be for supplies or services used to facilitate
 defense against or recovery from chemical, biological, radiological
 or nuclear (CBRN) attack. Special procurement procedures apply.
  MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
 NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
 CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
 UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
 USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
 INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
 AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
 PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
 CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
 A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
 MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
 RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for
 Manufacturers and Non-Manufacturers
  CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
 USED NOR INCORPORATED IN ANY ITEMS TO BE
 DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
 SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
 DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
 SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
 APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
 SPECIFICATION REQUIREMENTS.
 UNLESS OTHERWISE NOTED
 FIRST ARTICLE TESTING IS REQUIRED
 PRODUCTION LOT TEST REPORT MUST BE APPROVED BY
 DLA TROOP SUPPORT PRIOR TO CONTRACT DELIVERY.
 NOTE: THE CITED DRAWING IS A SOURCE CONTROLLED
 DRAWING AND AS OF THE DATE OF THIS SOLICITATION
 ONLY THE SOURCE(S) CITED ON THE DRAWING HAVE
 BEEN APPROVED. EVEN THOUGH SOURCES AND APPROVED
 PART NUMBERS ARE PROVIDED, THE ITEMS
 FURNISHED MUST MEET THE REQUIREMENTS OF THE
 CITED DRAWING. OFFERORS WHO ARE INTERESTED IN
 QUALIFYING THEIR PRODUCT FOR PURPOSE OF FUTURE
 ACQUISITION MUST CONTACT THE COGNIZANT DESIGN
 ACTIVITY SPECIFIED ON THE SOURCE CONTROLLED
 DRAWING.
 ALSO, MAY INCLUDE ADDITIONAL APPROVED SOURCES
 THAT HAVE NOT BEEN REFLECTED ON THE DRAWING AT
 THIS TIME.
 No shelf life markings are required.
 Cage Code: 1LEW5
 Avon Protection Systems, Inc.
 503 8th Street
 Cadillac, MI 49601-9282
  Contractor first article/preproduction approval testing required. Use
 DI-NDTI-80809B in preparation of the first article report. Current
 revision of MIL-HDBK-831 may also be used for report format guidance.
 First article testing shall be conducted IAW applicable drawings and
 drawing notes, specification, engineering instructions and specific
 requirements set forth in the contract. Additionally, 100% dimensional
 characteristics check shall be performed and results provided to the
 contracting officer. The first article offered must be manufactured at
 the facilities in which production quantities are procured under the
 contract. Contractor shall provide a statement along with objective
 evidence that test and production items meet the material and process
 requirements of the contract. If applicable, DD form 1423 documentation
 shall be provided as required. Unless F.A.T sample(s) is degraded or
 destroyed in testing or submitted for government fit, form, function
 verification (when specified by contract), the F.A.T. samples(s) may be
 deliverable with the last production run of the contract.
 Additional Wide Area Workkflow (WAWF) instructions for contractor first
 article test CLIN: The contractor shall code the receiving report for
 contractor first article test CLIN in WAWF as follows:
 A. Inspection at origin (source)- Enter the DCMA DODAAC listed on page 1
 of the contract.
 B. Acceptance at destination- Enter the issue by office DODAAC listed
 C. Ship to code - Enter the issue by office DODAAC listed on page 1 of
 the contract.
 Top drawing is source controlled. Buyers must (I) list military and
 vendor part number(s) in the solicitation, and (II)
 incorporate attached drawings into the contract. Source(s) must conform
  OTHER LOT Numbering Applies
 The Contractor shall provide standardized lot numbers on all Amplifiers,
 identifying the production run during which the units wereproduced. A
 copy of the records from the production runs shall be maintained by the
 Contractor for Government review, as requested,for a minimum time period
 of two years.
 to the drawing requirements. (CS120)
 LOT NUMBERINGThe Contractor shall provide standardized lot numbers on
 all amplifier adapters, identifying the production run during which the
 units were produced. A copy of the records from the production runs
 shall be maintained by the contractor for government review as requ
 ested, for a minimum time period of two years.
 Government Furnished Property (GFP)
 There is no GFP on this contract.
 SECTION C - ENGINEERING EXCEPTIONS
 The following Engineering Exceptions shall apply to this procurement:
 ANSI MH1, if required, can be obtained on the Material Handlers
 Institute of America's website, www.mhi.org, referenced simply
 as MH1. The standard is available at no cost, but free registration on
 the site is required to obtain the document.
 SOURCE CONTROL / VENDOR ITEM VERIFICATION:
 Drawing No. Date Vendor Part No. Verified
 ATTACHED DOCUMENTATION Yes Not Applicable
 CERTIFICATION
 This is an identified Chemical Biological Defense Equipment item.
 All packaged items of supply shall be marked IAW MIL-STD-129.
 Military packaging is required. Requirements defining levels of
 packaging shall be IAW MIL-STD-2073-1. If Special Packaging
 Instructions (SPI) are provided in the technical data package (TDP), the
 SPI's requirements will take precedence over MIL-STD-2073-1 where
 applicable.
 For all Chemical Biological Items, the First Article Test (FAT) waiver
 timeframe is reduced to one (1) year. The use of the Army Combat
 Capabilities Development Command Chemical Biological Center DEVCOM CBC
 Form 081 is required for all First Article Test waivers, (note: do not
 use a DD Form 1694  Request for Variance (or Waiver)  for a FAT waiver).
 Include RQ038 in the Material Master for all Chemical Biological Items.
 This supersedes the three (3) year waiver time frame allowed in
 Procurement Note H03- Supplemental First Article Testing Requirements.
 CRITICAL APPLICATION ITEM
 AVON PROTECTION SYSTEMS INCORPORATED 1LEW5 P/N 71009/6
 IAW BASIC DRAWING NR 81361 5-1-4337
 REVISION NR DTD 01/15/2019
 PART PIECE NUMBER:
 IAW REFERENCE DRAWING NR 81361 5-1-4337
 REVISION NR DTD 03/12/2024
 PART PIECE NUMBER:
 IAW REFERENCE QAP 81361 5-1-4337
 REVISION NR A DTD 01/25/2019
 PART PIECE NUMBER:
 IAW REFERENCE DRAWING NR 81361 5-1-4337
 REVISION NR A DTD 06/03/2020
 PART PIECE NUMBER:
 IAW REFERENCE QAP 14153 SQAP-FAT3
 REVISION NR DTD 06/15/2022
 PART PIECE NUMBER:
 IAW REFERENCE QAP 14153 SQAP-015430981
 REVISION NR DTD 10/25/2022
 PART PIECE NUMBER:
 IAW REFERENCE QAP 14153 SQAP-015430981
 REVISION NR DTD 04/01/2024
 PART PIECE NUMBER:
 IAW REFERENCE QAP 14153 SQAP-015430981
 REVISION NR DTD 06/20/2024
 PART PIECE NUMBER:
 PKGING DATA - MIL-STD-2073-1E
 QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ
 WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z
 UNIT CONT:ZZ OPI:A
 INTRMDTE CONT:D3 INTRMDTE CONT QTY:AAA
 PACK CODE:U
 MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
 SPECIAL MARKING CODE:00 -00 No special marking
 PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING
 REQUIREMENTS FOR PROCUREMENT
  IP025: PACKAGING, MARKING, AND SHIPPING OF HAZARDOUS MATERIALS
 SUPPLEMENTAL INSTRUCTIONS:
  -PLACE A RED X AND THE WORDS #SHORT BOX# ON THE FRONT OF ANY BOX THAT
 HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS
 SHOWING ON THE TOP FRONT OF THE PALLET LOAD.