Search Contract Opportunities

8(a) Design-Build SATOC   2

ID: W912HN19R3000 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: April 29, 2020, 8:40 a.m. EDT

Amendment 08:

A. CONTRACT CHANGES:
1. The following attachment is hereby added into and made a part of the solicitation:
a. Attachment 25, Pierce Range, Pierce Range, RCW Habitat, 19R3000
2. TECHNICAL SPECIFICATION CHANGES:
a. Solicitation section 00 10 00, Proposal Submission Requirements and Instructions Notes, is hereby
changed as follows:
FROM:
Proposal Due Date and Time: April 30, 2020
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 30 April 2020
Time by which Proposals are due: 1:00 PM EST
TO:
Proposal Due Date and Time:
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 7 May 2020
Time by which Proposals are due: 1:00 PM EST
b. Appendix A, Phase II, Seed Task Order Project, Section 1, is hereby changed as follows:
FROM:
Your proposal should be signed by a duly authorized official of your company and is required no later
than April 30, 2020 at 1:00 p.m. Local Time.
TO:
Your proposal should be signed by a duly authorized official of your company and is required no later
than 7 May 2020 at 1:00 p.m. Local Time.
c. Appendix A, Phase II Seed Task Order Project, Section 3, is hereby changed as follows:
FROM:
Proposal Due Date and Time:
Request For Proposal No: W912HN-19-R-3000
Due Date of Proposal: 30 April 2020
Time by which Proposals are due: 1:00 PM EST
d. Section 00 21 00 Instructions, Additional Notes to Offerors, Appendix A, Section 19 Technical
Requirements changes are incorporated into and made a part of the solicitation as follows:
From: A. Attachments 1-24
To: A. Attachments 1-25
B. CONTRACT DRAWINGS: There are no contract drawings changes with this Amendment.
All other terms and conditions remain unchanged.

Amendment 07: Non-existent due to system issues.

Amendment 06:

The purpose of Amendment 0006 is to:
A. CONTRACT CHANGES:
1. TECHNICAL SPECIFICATION CHANGES:
a. Appendix A, Phase II Seed Task Order Project, Section 16 Contractor Requirements, subparagraph
A is changed as follows:
FROM:
A. Project Involves Handling of Asbestos or Lead Base Paint.
Record of Survey
REC provided
TO:
A. Project Involves Handling of Asbestos or Lead Base Paint.
Record of Survey
REC provided
(Note: There is a potential (only) that the Project Involves Handling of Asbestos or Lead Base
Paint.)
b. Section 00 21 00, Appendix A, section 1, paragraph 4 is changed as follows:
FROM:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Friday, April 17, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
TO:
A site visit will be conducted on April 13, 2020 at 1:00 p.m. Bldg 6 Pierce Range, Fort Benning, GA.
The POC for the site visit is John Michael Abeln and can be contacted at (706) 513-5152. Questions
shall be submitted NLT, Monday, April 27, 2020 at 1:00 p.m. Local Time. All questions shall be
submitted through ProjNet.
B. CONTRACT DRAWINGS: The following drawing (Attachments 12-24) clarifications are hereby
incorporated into and made a part of the solicitation:
a. Young Range Drawing clarifications:
i. Attachments 12-22 are Young Range drawings and are renamed to add Young Range to the
file names as follows:
1. Attachment 12, Young Range Control Tower, Small Arms, 44047-E1, 19R3000
2. Attachment 13, Young Range Control Tower, Small Arms, 44047-E2, 19R3000
3. Attachment 14, Young Range Control Tower, Small Arms, 44047-E3, 19R3000
4. Attachment 15, Young Range Control Tower, Small Arms, 44047-E4, 19R3000
5. Attachment 16, Young Range Control Tower, Small Arms, 44047-E5, 19R3000
6. Attachment 17, Young Range Control Tower, Small Arms, 44047-E6, 19R3000
7. Attachment 18, Young Range Control Tower, Small Arms, 44047-E7, 19R3000
8. Attachment 19, Young Range Control Tower, Small Arms, 44047-E8, 19R3000
9. Attachment 20, Young Range, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
10. Attachment 21, Young Range Control Tower, Small Arms, ST-M2, 19R3000
11. Attachment 22, Young Range, Mtl Tower, Structural & Shop Drawings, 19R3000
ii. All Young Range drawings are provided for reference only
b. Pierce Range Drawing/Topo clarifications:
i. Attachment 24 is a Pierce Range drawing and is renamed to add Pierce Range to the file
name as follows:
1. Attachment 24, Pierce Range, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000
ii. All Pierce Range drawings and topo are provided for reference only
All other terms and conditions remain unchanged.

Amendment 05:

A. CONTRACT CHANGES:
1. The following Seed Project pre-bid site visit documents (Attachments 10-11) are hereby added into and
made a part of the solicitation.
a. Attachment 10, Pierce Range, Site Visit, Attendee Roster, 19R3000
b. Attachment 11, Pierce Range, Site Visit, Memorandum for Record, 19R3000
2. TECHNICAL SPECIFICATION CHANGES: Section V, Section 00 21 00 Proposal Submission
Requirements and Instructions Volume II-Technical Requirements changes are hereby added into and made
a part of the solicitation as follows:
From:
9. PHASE TWO TAB D FACTOR 3 TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a proposal for the sample/seed project
utilizing R.S. Means Cost Works.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in utilizing the applicable Construction
Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
To:
9. PHASE TWO TAB D FACTOR 3 TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the
sample/seed project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on
Cost Breakdown Schedule D and offeror shall provide ALL supporting documents (R.S. Means break out,
non-priced items, etc.). Offeror's proposal shall be prepared and meet the requirements as stated in Notes
To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Benning and their proposed Home
Office Overhead for the base period to the SEED project
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the
applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means.
Offerors will also be evaluated on how well they understand the required application of the proposed
coefficient and mark-ups.
9.2.2 The Government will evaluate strengths, weaknesses and any deficiencies in the submission. Based
on the submission provided, the Government will evaluate the Offeror's overall quantitative approach for
logic and reasonableness. The Offeror will also be evaluated on how well defined, clear and well supported
the approach is for the SEED project.
B. TECHNICAL SPECIFICATION CHANGES: Section 00 21 00 Instructions, Additional Notes to
Offerors, Appendix A, Section 19 Technical Requirements changes are incorporated into and made a part
of the solicitation as follows:
From: A. Attachments 1-9
To: A. Attachments 1-24
C. CONTRACT DRAWINGS: The following drawings (Attachments 12-22) are hereby incorporated into and
made a part of the solicitation:
a. Attachment 12, Range Control Tower, Small Arms, 44047-E1, 19R3000
b. Attachment 13, Range Control Tower, Small Arms, 44047-E2, 19R3000
c. Attachment 14, Range Control Tower, Small Arms, 44047-E3, 19R3000
d. Attachment 15, Range Control Tower, Small Arms, 44047-E4, 19R3000
e. Attachment 16, Range Control Tower, Small Arms, 44047-E5, 19R3000
f. Attachment 17, Range Control Tower, Small Arms, 44047-E6, 19R3000
g. Attachment 18, Range Control Tower, Small Arms, 44047-E7, 19R3000
h. Attachment 19, Range Control Tower, Small Arms, 44047-E8, 19R3000
i. Attachment 20, Ar OSUT 5, Control Tower MTL Arch Dwgs, 19R3000
j. Attachment 21, Range Control Tower, Small Arms, ST-M2, 19R3000
k. Attachment 22, Mtl Tower, Structural & Shop Drawings, 19R3000
l. Attachment 23, Pierce Range Ammo Issue Point, 19R3000
m. Attachment 24, 2014_Aerial_Photo_LIDAR_Topo_Info, 19R3000

Amendment 04:
A. CONTRACT CHANGES:
1. FAR Provision 52.228-1 is hereby replaced in its entirety.
2. TECHNICAL SPECIFICATION CHANGES: Appendix A, Seed Task Order Project technical
specifications are changed as follows:
a. Schedule B, Seed Task Order Project Capacity/Coefficient Schedule, is hereby removed in its entirety
b. Attachment 1, Technical SOW, Pierce Range Improvements, Seed Project, 19R3000 is removed from
the main body of the seed project Task Order document and is included as a separate attachment.
c. Attachment 8, Pierce Range Site Visit Map, 19R3000 is hereby added to and made a part of the
solicitation.
d. Attachment 9, GA SAS KTR Shelter In Place Exemption Memo_6APR20, 19R3000 is hereby added
to and made a part of the solicitation.
3. Appendix A, Seed Task Order Pre-bid site visit location is changed From: Bldg 6, Fort Benning, GA
To: Pierce Range, Fort Benning, GA
4. Appendix A, Seed Task Order, After Task Order Award section is replaced in its entirety
B. TECHNICAL SPECIFICATION CHANGES: Specification 01 33 16 Design After Award is hereby
added to and made a part of Appendix A, Seed Project, number 18.

Amendment 03-Phase II

Only those in the competitive range and selected for Phase II may submit a proposal.

Posted: April 27, 2020, 9:14 a.m. EDT
Posted: April 27, 2020, 8:37 a.m. EDT
Posted: April 23, 2020, 5:56 p.m. EDT
Posted: April 21, 2020, 5:10 p.m. EDT
Posted: April 21, 2020, 5:05 p.m. EDT
Posted: April 10, 2020, 7:22 p.m. EDT
Posted: April 1, 2020, 5:46 p.m. EDT

Overview

Response Deadline
April 30, 2020, 1:00 p.m. EDT Past Due
Posted
April 1, 2020, 5:46 p.m. EDT (updated: April 29, 2020, 8:40 a.m. EDT)
Set Aside
8(a) (8A)
Place of Performance
+ Savannah, GA United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
70% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 4/1/20 USACE Savannah District issued Solicitation W912HN19R3000 for 8(a) Design-Build SATOC due 4/30/20. The opportunity was issued with a 8(a) (8A) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Y1AZ.
Primary Contact
Title
Contracting Officer
Name
Magdalena Bernard   Profile
Phone
(912) 652-5131

Secondary Contact

Title
Contract Specialist
Name
Elizabeth Thorstad   Profile
Phone
(912) 652-5161

Documents

Posted documents for Solicitation W912HN19R3000

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W912HN19R3000

Award Notifications

Agency published notification of awards for Solicitation W912HN19R3000

IDV Awards

Indefinite delivery vehicles awarded through Solicitation W912HN19R3000

Contract Awards

Prime contracts awarded through Solicitation W912HN19R3000

Protests

GAO protests filed for Solicitation W912HN19R3000

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912HN19R3000

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912HN19R3000

Experts for 8(a) Design-Build SATOC

Recommended experts avaliable for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT SAVANNAH
FPDS Organization Code
2100-W912HN
Source Organization Code
100074192
Last Updated
Aug. 23, 2020
Last Updated By
PI33_DR_IAE_51681
Archive Date
Aug. 23, 2020