Search Contract Opportunities

$245M Multiple Award Task Order Contracts (MATOC), Sustainment, Restoration, and Modernization (SRM) Requirements, Okinawa, Japan   2

ID: W912HV24R0004 • Type: Solicitation

Description

Posted: May 22, 2025, 1:45 a.m. EDT
05/22/2025: PHASE TWO OF THIS SOLICITATION IS LIMITED TO OFFERORS SELECTED IN PHASE ONE FOR PARTICIPATION IN PHASE TWO. PHASE ONE HAS BEEN COMPLETE. THE RESPONSE DATE IS EXTENDED VIA AM-0003 FOR PHASE TWO PARTICIPANTS ONLY. ***AM-0002 The purpose of this modification is to extend Phase One proposal due date from 3 December 2024 to 5 December 2024, update Solicitation Sections 00 21 00, 00 22 00, and 00 22 16. View Projnet for Government responses to RFIs. ***AM-0001 The purpose of this amendment is to update Solicitation and Specifications and Drawings per RFI responses found in Projnet. RFI due date has been extended to 18 November 2024 at 10:00 am JST. Phase One proposal due date and time remain unchanged. Attachment A (Word document) is provided FOR REFERENCE ONLY (for convenience). The Contractor is responsible to make sure information in the word document is current after each amendment. Original: **THIS IS PHASE ONE OF SOLICITATION W912HV24R0004.*** This Two-Step Solicitation is for Indefinite-Delivery/Indefinite-Quantity (IDIQ) contracts to provide a variety of construction work throughout Okinawa, Japan. MATOC program is defined as an IDIQ contract entered into with two (2) or more sources pursuant to the same solicitation. The envisioned MATOC program is a firm-fixed price (FFP), IDIQ contract that provides a Design-Build (D-B) and Design-Bid-Build (DBB) vehicle for the execution of a broad range of Sustainment, Restoration, and Modernization (SRM) construction work to support U.S. Government facilities in Okinawa, Japan. Contractors will be expected to accomplish a wide variety of construction tasks involving multiple engineering/construction disciplines and trades, to include the likelihood of design and/or support of design for SRM projects. During the life of the contract, projects will be identified as task orders and will be competed amongst those successful contractor(s) who receive a basic contract under the MATOC.SRM construction work includes renovation, maintenance, repair, restoration, and alteration of existing facilities, but may also include major repairs and limited new construction within projects. Work may also entail the restoration, sustainment and/or modernization of water lines, sewer lines, roadways, building exteriors, roofing, building interiors, Heating Ventilation and Air Conditioning (HVAC) systems and components, refrigeration systems, fire suppression systems, fuel pipelines, storage systems, distribution and utilization systems (including lightning), power generators and Uninterrupted Power Supplies (UPS), or the abatement and disposal of asbestos, lead-based paint, and petroleum-contaminated material. Definitions: Sustainment. Sustainment means the maintenance and repair activities necessary to keep an inventory of facilities in good working order. Work includes regular roof replacement, refinishing of wall surfaces, repairing and replacement of heating and cooling systems, replacing tile and carpeting, and similar types of work. Restoration. Restoration means the restoration of real property to such a condition that it may be used for its designated purpose. Restoration includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident, or other causes. Modernization. Modernization activities involve the alteration or replacement of facilities solely to implement new or higher standards (including regulatory changes); to accommodate new functions; or to replace building components that typically last more than 50 years (such as foundations and structural elements). Please follow links below to see the Solicitation document and relevant attachments.
Posted: Nov. 21, 2024, 8:18 p.m. EST
Posted: Nov. 5, 2024, 10:39 p.m. EST
Posted: Sept. 26, 2024, 11:26 p.m. EDT
Posted: Sept. 26, 2024, 11:13 p.m. EDT
Background
This solicitation, W912HV24R0004, is issued by the U.S. Army Corps of Engineers, Japan District, for a Multiple Award Task Order Contract (MATOC) program aimed at providing a variety of construction work throughout Okinawa, Japan.

The goal is to support U.S. Government facilities through Sustainment, Restoration, and Modernization (SRM) construction efforts. The MATOC program will be a firm-fixed price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract that allows for both Design-Build (D-B) and Design-Bid-Build (DBB) project execution.

Work Details
The contract encompasses a wide range of construction tasks involving multiple engineering and construction disciplines. Key tasks include:

- Renovation, maintenance, repair, restoration, and alteration of existing facilities;
- Major repairs;
- Limited new construction;
- Restoration and modernization of water lines, sewer lines, roadways;
- Building exteriors and interiors;
- Roofing;
- HVAC systems;
- Refrigeration systems;
- Fire suppression systems;
- Fuel pipelines;
- Storage systems;
- Distribution and utilization systems including lighting;
- Power generators and Uninterrupted Power Supplies (UPS);
- Abatement and disposal of hazardous materials such as asbestos and lead-based paint. The work also includes zero to 100 percent design effort for various maintenance and repair projects.

Place of Performance
Okinawa, Japan

Overview

Response Deadline
Sept. 22, 2025, 12:00 a.m. EDT (original: Dec. 3, 2024, 12:00 a.m. EST) Due in 122 Days
Posted
Sept. 26, 2024, 11:13 p.m. EDT (updated: May 22, 2025, 1:45 a.m. EDT)
Set Aside
None
Place of Performance
Camp Foster , JP-47 JPN Camp Foster Japan
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$245,000,000 (value based on agency estimated range)
Vehicle Type
Indefinite Delivery Contract
On 9/26/24 USACE Japan District issued Solicitation W912HV24R0004 for $245M Multiple Award Task Order Contracts (MATOC), Sustainment, Restoration, and Modernization (SRM) Requirements, Okinawa, Japan due 9/22/25. The opportunity was issued full & open with NAICS 236220 and PSC Y1JZ.
Primary Contact
Name
Valeria Fisher   Profile
Phone
(098) 970-9068

Secondary Contact

Name
Jack Letscher   Profile
Phone
(315) 645-4402

Documents

Posted documents for Solicitation W912HV24R0004

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W912HV24R0004

Incumbent or Similar Awards

Contracts Similar to Solicitation W912HV24R0004

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912HV24R0004

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912HV24R0004

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > POD > US ARMY ENGINEER DISTRICT JPN
FPDS Organization Code
2100-W912HV
Source Organization Code
500039119
Last Updated
May 22, 2025
Last Updated By
valeria.fisher@usace.army.mil
Archive Date
May 22, 2026