Search Contract Opportunities

24-0018 - Construct South Lot 3

ID: 2026_South_Lot • Type: Sources Sought • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

This is a SOURCES SOUGHT notice; a market survey for information only, to be used for preliminary planning purposes.

This is NOT a request for quotes or proposals. The intent of this notice is to identify qualified, experienced, and interested offerors capable of performing the type of work as described herein for information and planning purposes. The information received will be utilized by the United States Air Force to facilitate the planning and decision-making process and will not be disclosed outside of the agency. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. Respondents will NOT be notified of the results of this sources sought. Respondents are not required to submit information in response to this announcement to participate in any future solicitation that may come as a result of the information received. In accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(c)(2), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.

The 55th Contracting Squadron, Offutt Air Force Base, NE, is seeking information for the following items listed below:

General:

The purpose of this sources sought is to conduct Market Research in accordance with RFO Part 10, for the construction of an addition to the south parking lot of Building B1000 at Offutt AFB, Nebraska.

This requirement includes comprehensive site preparation and paving operations. Work consists of demolition and removal of existing surfaces, clearing and grubbing, and earthwork/subgrade preparation. The new pavement construction includes the application of bituminous tack and prime coats followed by road-mix asphalt paving. Additionally, the project requires cast-in-place concrete construction for associated concrete curbs, gutters, and sidewalks.

This project also includes the installation of a new stormwater utility system, encompassing reinforced concrete storm drain pipes, precast manholes, and curb inlets, complete with post-installation CCTV inspection of the sewer lines. Furthermore, the contractor will be responsible for applying road and parking lot pavement markings (including surface preparation and reflective paint application), coordinating with the Omaha Public Power District (OPPD) for the installation of new parking lot light poles and bases, and performing final site restoration including topsoil placement and seeding.

All project work and related services shall be performed IAW all terms, conditions, special contract requirements, specifications, drawings, attachments, technical exhibits and references and publications contained in the contract or incorporated by reference.

All information is voluntary. The capabilities package should be complete and sufficiently detailed enough to allow the Government to determine the firm's qualifications to perform the defined work. Your response should include the following information:

Company Information

Company name

Address

Point of contact

Telephone and fax number

E-mail address

Website (if available)

Commercial and Government Entity (CAGE) Code

Unique Entity ID (UEI) Number

Socio-Economic status (i.e., 8(a), HUBZone, women-owned, service-disabled veteran-owned, etc.)

Experience and overview of your company

Responses to this sources sought announcement can be submitted to the 55th Contracting Squadron via e-mail to guillermo.espinoza@us.af.mil by 11:00 AM Central Standard Time on 7 July 2026.

IF A SOLICITATION IS ISSUED, IT WILL BE ANNOUNCED AT A LATER DATE. All interested parties must respond to any solicitation announcement separately from the responses to this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement.

Background
The 55th Contracting Squadron at Offutt Air Force Base, Nebraska, is conducting a market survey to identify qualified and experienced contractors for the construction of an addition to the south parking lot of Building B1000.

This sources sought notice is intended for preliminary planning purposes and will assist the United States Air Force in decision-making regarding future solicitations.

Work Details
The project involves comprehensive site preparation and paving operations, including:

- Demolition and removal of existing surfaces.
- Clearing and grubbing.
- Earthwork/subgrade preparation.
- Application of bituminous tack and prime coats followed by road-mix asphalt paving.
- Cast-in-place concrete construction for curbs, gutters, and sidewalks.
- Installation of a new stormwater utility system with reinforced concrete storm drain pipes, precast manholes, and curb inlets.
- Post-installation CCTV inspection of sewer lines.
- Application of road and parking lot pavement markings (including surface preparation and reflective paint application).
- Coordination with Omaha Public Power District for new parking lot light poles and bases.
- Final site restoration including topsoil placement and seeding.

All work must comply with the terms, conditions, special contract requirements, specifications, drawings, attachments, technical exhibits, and references contained in the contract or incorporated by reference.

Place of Performance
Offutt AFB NE 68113 UNITED STATES

Bidder Requirements
Contractors must demonstrate qualifications to perform the defined work. Specific requirements include providing company information such as name, address, point of contact, telephone number, email address, website (if available), CAGE Code, UEI Number, socio-economic status (e.g., 8(a), HUBZone), and an overview of company experience.

Additionally, contractors must be capable of performing surface preparation for pavement markings according to specified standards.
Loading Map
Loading Map

Overview

Response Deadline
July 7, 2026, 12:00 p.m. EDT Due in 7 Days
Posted
June 29, 2026, 10:53 a.m. EDT
Set Aside
None
Place of Performance
Offutt AFB, NE 68113 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
Experimental
$1,500,000 - $5,000,000 (AI estimate)
Odds of Award
32%
Signs of Shaping
The solicitation is open for 8 days, below average for the Air Combat Command. 77% of similar contracts within the Department of the Air Force had a set-aside.
On 6/29/26 Air Combat Command issued Sources Sought 2026_South_Lot for 24-0018 - Construct South Lot 3 due 7/7/26. The opportunity was issued full & open with NAICS 237310 and PSC Y1LZ.
Primary Contact
Name
Laura Stemick   Profile
Phone
(402) 232-5943

Secondary Contact

Name
Guillermo Espinoza   Profile
Phone
(402) 232-6484

Documents

Posted documents for Sources Sought 2026_South_Lot

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 2026_South_Lot

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 2026_South_Lot

Experts for 24-0018 - Construct South Lot 3

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > ACC > FA4600 55 CONS PKP
FPDS Organization Code
5700-FA4600
Source Organization Code
100141072
Last Updated
June 29, 2026
Last Updated By
laura.stemick@us.af.mil
Archive Date
July 22, 2026