Search Contract Opportunities

127EAW25R0052 - Upper Golden Trout Bridge Replacement   3

ID: 127EAW25R0052 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Sept. 24, 2025, 1:53 p.m. EDT

127EAW25R0052 - Upper Golden Trout Bridge Replacement - A00001
Plumas National Forest

This amendment is to post RFI responses and extend the proposal due date.

Proposal due date / time is hereby extended from 09/01/2025 to 09/03/2025, 1:00 PM PST.

Attached is "RFI Official Responses - 1" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.

///////////////////////////////////////////////////////////////////////////////////////////////////////

127EAW25R0052 - Upper Golden Trout Bridge Replacement
Plumas National Forest

FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000
Set Aside: Total Small Business Set Aside

IMPORTANT NOTES:
See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal

All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025.

A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Posted: Aug. 25, 2025, 7:56 p.m. EDT
Posted: July 29, 2025, 3:56 p.m. EDT
Background
The Upper Golden Trout Bridge Replacement project is issued by the US Department of Agriculture (USDA) Forest Service. The project aims to replace a damaged bridge crossing the South Fork Feather River at Golden Trout, which was compromised in 2017 due to a large tree striking its metal I-Beam support. A temporary repair was made, and this contract seeks to secure funding and design for a permanent replacement.

The project also addresses environmental concerns related to threatened species in the area.

Work Details
The contractor is required to furnish all materials, equipment, supplies, and personnel necessary for the complete removal and disposal of the existing Upper Golden Trout Bridge, including the bridge span, structures, abutments, and approaches. The contractor will then replace it with a new structure as specified in the project plans and specifications. Key tasks include:
- Removal of existing bridge components
- Disposal of all excavated dirt without leaving it scattered on-site
- Installation of sediment control devices before excavation work begins
- Compliance with biological monitoring requirements during ground disturbing activities
- Proper disposal of construction debris off National Forest Land
- Notification to the Contracting Officer Representative (COR) prior to any ground disturbing activities.

Period of Performance
The estimated period of performance for this contract is from October 1, 2025, to November 30, 2026.

Place of Performance
The construction projects will be performed at Upper Golden Trout Bridge located on Forest Route 22N24, approximately 3.4 miles from the intersection of Forest Route 22N27 & 22N24 in Plumas National Forest.

Overview

Response Deadline
Sept. 3, 2025, 4:00 p.m. EDT (original: Sept. 1, 2025, 4:00 p.m. EDT) Past Due
Posted
July 29, 2025, 3:56 p.m. EDT (updated: Sept. 24, 2025, 1:53 p.m. EDT)
Set Aside
None
Place of Performance
Clipper Mills, CA 95930 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$1,000,000 - $5,000,000 (value based on agency estimated range)
Signs of Shaping
97% of similar contracts within the Forest Service had a set-aside.
On 7/29/25 USFS Region 5: Pacific Southwest Region issued Solicitation 127EAW25R0052 for 127EAW25R0052 - Upper Golden Trout Bridge Replacement due 9/3/25. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Greg Cunningham   Profile
Phone
None

Documents

Posted documents for Solicitation 127EAW25R0052

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation 127EAW25R0052

Award Notifications

Agency published notification of awards for Solicitation 127EAW25R0052

Contract Awards

Prime contracts awarded through Solicitation 127EAW25R0052

Incumbent or Similar Awards

Contracts Similar to Solicitation 127EAW25R0052

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 127EAW25R0052

Similar Active Opportunities

Open contract opportunities similar to Solicitation 127EAW25R0052

Additional Details

Source Agency Hierarchy
AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > USDA-FS, CSA SOUTHWEST 6
FPDS Organization Code
12C2-127EAW
Source Organization Code
500168745
Last Updated
Sept. 24, 2025
Last Updated By
gregory.cunningham@usda.gov
Archive Date
Sept. 18, 2025