Search Contract Forecasts

WATERFRONT - CBMM - BRAVO 13-19 - REPAIR BULKHEAD

Type: Forecast

Overview

Description
In a 2018 study conducted by Collins, it was found that part of B14 and B15 have areas of settlement/sinkholes inshore of the bulkhead 1. Voids in existing bulkhead are allowing backfill material to escape, sinkholes are developing in the bituminous pavement above, and mobile cranes are restricted from traveling over this area. Recommended Repairs 1. Sealing voids in existing bulkhead 2. Remove bituminous pavement 3. Fill voids with flowable fill 4. Replace bituminous pavement 5. Re-stripe bituminous pavement 6. Mobile crane load restrictions will be removed as a result
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q4 2025
Source Est. Solicitation Date
Q4 2025
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for WATERFRONT - CBMM - BRAVO 13-19 - REPAIR BULKHEAD around Q4 2025 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Hawaii
Source Level 3 Agency
N62478

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/8/24
Date Modified
6/8/24
Additional Notes
MAC - General and RFP - LP