(SEED) Replace HVAC System, MAB3, B/6600, SWFPAC

Type: Forecast

Overview

Description
(SEED) Requirement: Design/Build - Build a New Mechanical room at 6600 to accommodate redundant equipment and replace inadequate equipment in Mechanical Room 119. New Mechanical room should include, but not limited to: boiler, chiller, hot water pump, chill water pump, process water pumps, water treatment plant for chilled and heating water systems, panelboards, motor control units, humidifiers, auxiliary heating coils, and monitoring systems. Additional components shall include, but not limited to: cooling and heating piping and associated valves, portable chiller connection, electrical distribution panels, fire dampers, addressable interface devices, manual disconnects, notification appliances, smoke detectors, heat detectors, monitor modules, and humidity detectors. Install Direct Digital Controls (DDC), associated cabinets and program components. Replace inadequate equipment Mechanical Room 119. Air handling units (AHU) should incorporate direct drive variable frequency drive (VFD) units with sealed bearings, modify air filter access on all AHU enclosures, replace all air handling unit sensors. Replace Hot Water Pump 1, Hot Water Pump 2 circuit setter, Chill Water Pumps 1 and 2, Process Water Pumps 1 and 2, Process Water Pumps 1 and 2 circuit setters, Coil Circulation Pumps 1 and 2, and failed cooling and heating valves. Replace humidifiers, upgrade all controls to DDC and clean all existing ductwork. Replace any failed dampers and actuators. Ensure proper system operation upon completion of the project. Ensure modifications are made to include the BOSC contract maintenance. Dispose of old material. Consider existing equipment listed below. NOTE: Refer to "2020 SWFPAC Environmental Study" for additional resource. Justification: Redundancy is required to ensure continuous production support. Reliabi ... NOTE: description has been truncated, please see Project Note for full description.
Est. Value
Min: $50,000,000
Max: $100,000,000
Est. Award Date
Q4 2026
Source Est. Solicitation Date
Q4 2025
Set Aside
TBD
Pricing
Fixed-Price
Procurement Method
Delivery Order/Task Order (not under Federal Supply Schedule Contract)
Forecast Type
New
Place of Performance
NW: CORE PDC, USA
Forecast Source
Naval Facilities Engineering Command
NAVFAC Northwest is forecasted to issue a new procurement for (SEED) Replace HVAC System, MAB3, B/6600, SWFPAC around Q4 2026 worth up to $100,000,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC Northwest
Source Level 3 Agency
N44225

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/12/25
Additional Notes
MAC - General and RFP - BVSS (Two Step)