RM23-0697 WWTP Upgrades Sigonella NASII (CONSTRUCTION)
Type: Forecast
Overview
Description
UEM RISKTOOL PROJECT: SIG-NAS2-SS-B402
This project will modernize of the entire WWTP complex using MBR technology to satisfy the discharge limits. The objectives of the special project are:
1. Construction of a new MBR type plant
The design proposal is to create a single tank with two trains working in parallel. Each line shall be sized to handle up to peak flow and allow for scheduled maintenance. A system for dividing the flow rate on the two lines shall be installed. Adjacent to the plant, a technical room must be created for housing the electromechanical equipment and a chemical room for housing the tanks for maintenance cleaning of the membranes.
2. Expansion of new office and laboratory
The special project includes the extension of the office and the laboratory. The laboratory, once expanded, will be divided into an area for the analysis of wastewater and an area for the analysis of drinking water. A new workstation will also be added. The venue will be equipped with solar panels to produce solar energy. For WWTP, a workroom for SCADA control will be created. Furthermore, will be created a third office for work center supervisor.
3. Repair of B402 electrical room
The special project involves raising the electrical room in order to further mitigate the entry of water into the room. Furthermore, the project provides for the structural renovation of the room and a new electrical panel. The room must be adequately ventilated and equipped with a new UPS system.
4. Repair of dry bed
The special project involves the repair of the deteriorated concrete parts and the raising of the perimeter walls to enhance the capacity of the bed.
5. Conversion of filters to disinfection chamber
Once the filters have been removed, baffles will be made to allow adequate disinfection of the treated wastewat ...
NOTE: description has been truncated, please see Project Note for full description.
Est. Value
Min: $2,000,000
Max: $7,500,000
Max: $7,500,000
Est. Award Date
Q1 2027
Source Est. Solicitation Date
Q1 2027
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for RM23-0697 WWTP Upgrades Sigonella NASII (CONSTRUCTION) around Q1 2027 worth up to $7,500,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Europe Africa Central
Source Level 3 Agency
N62470
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
12/30/24
Date Modified
12/30/24