Search Contract Forecasts

REPLACE UNDERGROUND ELECTRICAL WIRINGS FOR WELLS, MODULES, AND TRANSFER STATION CONNECTED TO MCC-1 AND MCC-2

Type: Forecast

Overview

Description
Revised scope of work includes: 1] Replace existing underground electrical wiring for wells & modules connected to MCC-1 and MCC-2 ; 2] Provide temporary power supply to all water wells, transfer pumps of modules ( A, C, E, & F ) connected to MCC-1 and all water wells, transfer pumps of modules ( G, H, J & L ) connected to MCC-2 ; 3] Remove existing u/g THHN wires connected from water wells, SCADA control panel & transfer pumps of modules ( A, C, E & F ) connected to MCC-1 ; 4] Remove existing u/g THHN wires connected from water wells, SCADA control panel & transfer pumps of modules ( G, H, J & L ) connected to MCC-2 ; 5] Provide / pull / install new RHW-2 wires on the provided new underground electrical trench via manholes thru intercept existing u/g secondary conduit for modules & wells connected from MCC-1 & MCC-2 ; 6] Perform insulation resistance testing and validate if resistance pass the minimum requirement; 7] Perform dry run testing of all pumps.
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q2 2026
Source Est. Solicitation Date
Q2 2026
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for REPLACE UNDERGROUND ELECTRICAL WIRINGS FOR WELLS, MODULES, AND TRANSFER STATION CONNECTED TO MCC-1 AND MCC-2 around Q2 2026 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Far East
Source Level 3 Agency
N62742

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/8/24
Date Modified
6/8/24
Additional Notes
MAC - General and RFP - LP