CONTRACT FORECAST

Replace Transformer and Install Switchgear at various location ( Victor 2, Sierra 2 and Victor 3 substation), NBG Apra Harbor

Type: Forecast

Overview

Description
For Victor 2: Provide/install two(2) each 500kVA and one(1) each 150kVA pad mounted transformer, 13.8KV primary voltage; 480Y/277 volts secondary voltage; oil filled outdoor type; Provide/install oil insulated two(2) each 15KV pad mounted 6 way fire resistant biodegradable Vacuum Fault Interrupter (VFI) type switches. For Sierra 2 & Victor 3 Substation: Provide/install one(1) each 500kVA pad mounted transformer, 13.8KV primary voltage; 480Y/277 volts secondary voltage; oil filled outdoor type: Provide/install two(2) each 15KV pad mounted 4 way fire resistant biodegradable Vacuum Fault interrupter (VFI) Type Switches.
Est. Value
Min: $1,000,000
Max: $7,000,000
Est. Award Date
QTR 1 2024 Future Opp
Set Aside
MAC ‐ SB and RFP ‐ LP
Forecast Type
New
NAVFAC Marianas is forecasted to issue a new procurement for Replace Transformer and Install Switchgear at various location ( Victor 2, Sierra 2 and Victor 3 substation), NBG Apra Harbor around QTR 1 2024 worth up to $7,000,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC MARIANAS

Contacts

Point of Contact
Borja, Patricia Ann B
Point of Contact Email

Similar Active Opportunities

Potential Bidders and Partners

Additional Detail

Date Published
6/16/22
Source Est. Solicitation Date
QTR 1 2024
Additional Notes
MAC ‐ SB and RFP ‐ LP