Replace Pump Room Control Console and Redesign Facility Sewer System, B7424, TRF- Bangor (DBB-AE)
Type: Forecast
Overview
Description
1. Replace and upgrade control console in the drydock pump room and all associated systems and sub-systems.
2. Redesign to increase capacity of facility sewer tanks. Improve volumes of pumping of sewer from internal tanks to external sewer system.
3. Design and install protective metal envelop for the two entryways. Envelope will have an overhead access to have the ability to lift equipment in or out of the facility from below. Install interior lighting. Each entryway is approximately 15 by 10 FT and with similar configuration.
Est. Value
Min: $2,000,000
Max: $7,500,000
Max: $7,500,000
Est. Award Date
Q4 2028
Source Est. Solicitation Date
Q4 2027
Set Aside
8(a) Competitive
Pricing
Fixed-Price
Procurement Method
Delivery Order/Task Order (not under Federal Supply Schedule Contract)
Forecast Type
New
Place of Performance
NW: BANGOR PDC, USA
Forecast Source
Naval Facilities Engineering Command
NAVFAC Northwest is forecasted to issue a new procurement for Replace Pump Room Control Console and Redesign Facility Sewer System, B7424, TRF- Bangor (DBB-AE) around Q4 2028 worth up to $7,500,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC Northwest
Source Level 3 Agency
N44225
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
6/12/25
Additional Notes
MAC - 8A and RFP - BVSS (Two Step)