Replace Critical Structure Piles, EHW-1, B/7501, Bangor (Phase 8 of 9) (23591691)

Type: Forecast

Overview

Description
Cat-2 FY25/Q3 Design FY28 Construction This project replaces deteriorating 24-inch critical structural concrete pilings at the Explosives Handling Wharf (EHW) with 30-inch steel pipe piles. The project includes removing the existing concrete pilings, installing replacement piles with Cathodic protection and constructing pile caps over the tops of the replacement piles. Existing deck and wall sections will be removed for crane access and then replaced. Additional work includes repairing construction-related damage to the EHW walls, deck and systems and other work necessary to restore the facility to operating condition.
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q1 2028
Source Est. Solicitation Date
Q1 2028
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for Replace Critical Structure Piles, EHW-1, B/7501, Bangor (Phase 8 of 9) (23591691) around Q1 2028 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Northwest
Source Level 3 Agency
N44225

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
12/30/24
Date Modified
12/30/24