Description
The project will include dredging of the Anaheim Bay Entrance Channel, portions of the Inner Harbor and the Public Navigation Channel for Naval Weapons Station Seal Beach (522,000 CY). The project will include an Option to dredge portions of the Outer Harbor and Outer Harbor -Extension (33,000 CY). The combined volume of dredged material is approximately 555,000 cubic yards.
1. WORK LOCATION
Base-Building: NWSSB
Entrance to Anaheim Bay.
3. ISSUE & IMPACT (If not completed):
If the dredging is not completed, it could become a hazard to ships entering the port area.
4. DESCRIPTION OF WORK (Full Project SCOPE):
BASE:
In general, the entrance channel appears in fair shape, considering it's been five years since it was last dredged. There is some notable shoaling along the right outer quarter, with high spots in the -36' MLLW range on the extreme eastern edge of the channel. The middle two quarters of the channel are consistently at -38' MLLW or deeper.
In general, the inner harbor is in good shape and there is little available material above the design depth.
Shoaling is occurring in the Public Navigation Channel, closest to the PCH bridge. It has shoaled as high as -14' in some areas. The design depth is -20'.
Dredge 522,000 CY of material.
Sampling and testing of sediment, and EA preparation to be completed in FY24
Bathymetry from the Jan 23 survey, CAD drawings and quantity calculations, along with historical dredge information has been placed here.
OPTION:
Volume calculations with the outer harbor extension' polygon included. Quantity comes to about 33,000cy with 2' of over depth.
Est. Value
Min: $7,500,000
Max: $100,000,000
Max: $100,000,000
Est. Award Date
Q2 2026
Source Est. Solicitation Date
Q2 2026
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for PD22602633 - EN - REMOVE - DREDGE HARBOR SEDIMENT - SEABEA-311 - NWS SBCH around Q2 2026 worth up to $100,000,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Southwest
Source Level 3 Agency
N62473
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
12/30/24
Date Modified
12/30/24