Search Contract Forecasts

NSA MECH Site Fire Suppression - SEED PROJECT FOR 8(a) PA AOR MACC

Type: Forecast

Overview

Description
Intent is to determine if the existing electric and diesel fire pumps in buildings 2 and 18B should be replaced in kind, replaced with other different pumps, replaced in only one location and eliminated in the other,eliminated in both locations and replaced with appropriate pressure reducing valves, or some other solution. Study should consider at a minimum: fire suppression water requirements at the buildings, both the current demand and the anticipated future demand based on bringing building suppression systems up to current standards, the condition and flow capacity of the water mains, the pressures available from the utility providers, and any other relevant factors. Study should consider the three water utility connections in B.1/B.2, B.18B, & B.905 as well as the existing basewide fire pumps in B.2 & B.18B and the DLA owned pump in B.111B. Intent is to have a study which researches the current water system condition, the fire suppression water requirements, and proposes one or more solutions that would become the basis for a separate future design effort.
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q3 2026
Source Est. Solicitation Date
Q3 2025
Set Aside
8(a) Competitive
Pricing
Fixed-Price
Procurement Method
Delivery Order/Task Order (not under Federal Supply Schedule Contract)
Forecast Type
New
Place of Performance
TBD, USA
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for NSA MECH Site Fire Suppression - SEED PROJECT FOR 8(a) PA AOR MACC around Q3 2026 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC Mid-Atlantic
Source Level 3 Agency
N40085

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/12/25
Additional Notes
MAC - 8A and RFP - LP