DBB with Construction Contract award in FY27 or FY28 (FY25 AE Design)
This project completes full wall tieback repairs and performs work on the floor of Dry
Dock 4, as needed to support a ship stability system.
The dry dock is currently limited to one asset at a time without full wall tieback. This
project will also include the installation of foundations on the dry dock floor, as
needed to support ship stability systems. Existing ground water relief wells will be
overhauled, and additional groundwater relief wells will be installed in the dry dock
floor to ensure drain system integrity. Drainage wells and pumps will be installed to
alleviate ground water infiltration issues in Pumpwell 4 during extended dock floodings.
Evidence from the previous wall tie back project indicates that injected grout has
migrated into the drainage curtain, and potentially reducing its drainage capacity.
Overhaul of the existing ground water relief wells and installing new wells is needed to
ensure restoration of the groundwater drainage system to its design capacity. Drainage
pumps will be installed to alleviate flooding issues in Pumpwell 4.
Est. Value
<$2,000,000
Est. Award Date
Q4 2027
Source Est. Solicitation Date
Q4 2026
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for (AE-DBB_23824429) (SIOP) Seismic Repair DD4, B704, PSNS (DBB-AE) around Q4 2027 worth up to $2,000,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Northwest
Source Level 3 Agency
N44225
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
6/8/24
Date Modified
6/8/24
Additional Notes
RFP - BVSS (One Step)