Search Defense Budget

Physical Security Equipment

Category: Procurement • Line Item: 6438 • FY26 Budget Request: $52.4M

Overview

Budget Account
1109N - Procurement, Marine Corps
Budget Activity
06 - Engineer and other equipment
Previous Year
Description

The Physical Security Equipment line item (LI 6438) in the FY 2026 Navy budget supports the procurement and installation of advanced security systems and equipment across Marine Corps installations. The overarching goal of this program is to enhance the protection of critical assets, personnel, and infrastructure by deploying technological solutions that reduce reliance on manpower-intensive security measures. This line item is managed under the Procurement, Marine Corps appropriation, specifically within the Engineer and Other Equipment budget activity. It encompasses several subprograms targeting different aspects of installation security and operational support.

Collateral Equipment funding is the largest component of this line item. The objective is to provide one-time, initial outfitting of new and renovated facilities with equipment not considered built-in, such as Mass Notification Systems, Intrusion Detection Systems, Closed Circuit TVs, IT switches and routers, Passive Optical Networks, grounding systems, and various industrial systems. These investments are directly tied to the completion schedules of military construction projects, including fire stations, aircraft hangars, armories, communication centers, fuel stations, headquarters buildings, and other mission-critical facilities. The program aims to ensure that new infrastructure is immediately operational and compliant with security and safety standards upon occupancy.

Installation Physical Security funding supports the deployment of automated access control systems, intrusion detection, surveillance cameras, classified material storage, early warning detection systems, and mass notification capabilities. These systems are installed in accordance with USMC policy to safeguard assets, property, and personnel. A portion of this funding is allocated to the Defense Policy Review Initiative (DPRI) for installations in Okinawa, specifically Camps Schwab, Hansen, and Foster, reflecting ongoing efforts to upgrade physical security in alignment with strategic realignments and international agreements.

Command Support Equipment (CSE) focuses on life cycle replacement and modernization of industrial equipment supporting Marine Corps ground bases and air stations. This includes upgrades to warehouse conveyor systems, power generators, and recycling systems. Projects for FY 2026 include a warehouse upgrade at MCB Camp Pendleton and an industrial equipment upgrade for an F-35 hangar. The decrease in funding from the previous year reflects a strategic shift to prioritize higher-level requirements and optimize resource allocation.

Facility-Related Control Systems (FRCS) funding supports the procurement of industrial control systems and operational technology equipment, including cybersecurity measures. These systems manage and regulate critical infrastructure such as HVAC, electrical, and wastewater treatment, as well as fire and life safety controls. The inclusion of servers, computers, and monitoring devices ensures secure and efficient operation of facility-related systems, contributing to both physical security and operational resilience.

Mobile All-Domain Observation and Sensing System (MA-DOSS) is a newer addition to the program, providing persistent, mobile, and modular surveillance capabilities using sensor-agnostic unmanned platforms. MA-DOSS employs artificial intelligence and machine learning for computer vision, enabling advanced detection, classification, and tracking of threats across all domains. The system supports the Fleet Marine Force and Expeditionary Advanced Bases, enhancing force protection and enabling sea denial and control operations. FY 2026 funding reflects the transition of MA-DOSS to operational deployment following product development.

Budget Trend

Physical Security Equipment Procurement Programs (6438) budget history and request


Interactive stacked bar chart for exploring the Physical Security Equipment budget
Interactive line chart for exploring the Physical Security Equipment budget
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested
$14,851,000 $10,996,000 $30,228,000 $23,495,000 $38,462,000 $28,306,000 $18,404,000 $23,063,000 $87,120,000 $43,385,000 $49,350,000 $46,148,000 $52,394,000
The DoD did not provide line item forecasts in its FY26 budget request, see the prior year budget for any forecasted years
Download

FY2026 Defense Budget Detail

Loading
Loading
FY2026 Budget Released: 06/30/25