Search Defense Budget

Paladin Integrated Management (PIM)

Category: Procurement • Line Item: 2073GZ0410 • FY27 Budget Request: $84.2M

Overview

Budget Account
2033A - Procurement of Weapons and Tracked Combat Vehicles, Army
Budget Activity
01 - Tracked combat vehicles
Previous Year
Description

Paladin Integrated Management (PIM) is an Army tracked-vehicle modernization program supporting the Long-Range Precision Fires priority. The fiscal year (FY) 2027 request appears under Procurement of Weapons and Tracked Combat Vehicles, Army, in Budget Activity 01, Tracked Combat Vehicles, and Budget Subactivity 20, Modification of Tracked Combat Vehicles. PIM is a service-ready Acquisition Category IC Major Defense Acquisition Program. It replaces the M109 Family of Vehicles in cannon-fires battalions of Armored Brigade Combat Teams and at Echelons Above Brigade on a one-for-one basis.

The program addresses the capability gap left by termination of the Non-Line of Sight Cannon in June 2009, as well as obsolescence and space, weight, and power limitations in the existing fleet. That fleet pairs the M109A6 Self-Propelled Howitzer (SPH) with the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV). PIM incorporates current Bradley Fighting Vehicle suspension and drivetrain components, Future Combat Systems-developed Electric Gun Drive systems, and current-fleet armament into a new chassis. Its objectives are better Soldier protection, vehicle survivability and mobility, capacity for future capabilities, lower life-cycle costs, and an extended service life for the M109 family.

PIM consists of the M109A7 SPH and a Carrier Ammunition Tracked (CAT). The CAT shares the new chassis components and associated protection and mobility characteristics but does not carry the components directly related to the cannon system. Together, one howitzer and one CAT constitute a vehicle set for the program's unit-cost reporting. Fielding is planned to continue until the Army Acquisition Objective of 689 sets is met.

The acquisition is moving from production awards toward completion of fielding and sustainment. BAE's York facility received the FY 2025 manufacturing award for 39 sets, with first delivery scheduled for August 2027. A further award for 40 sets was scheduled for April 2026, with first delivery scheduled for August 2028; its manufacturing estimate was based on contractor proposals and could change after negotiations. FY 2026 is identified as the final year of production contract awards, explaining the smaller FY 2027 request and its emphasis on fielding rather than new manufacturing.

Government System Engineering and Program Management funding in FY 2027 supports oversight of contractor production operations as vehicles continue toward delivery. Activities include quality-process management; weekly, monthly, and quarterly program-management reviews; management of Government-furnished property and material; and engineering work on waivers, deviations, problem resolution, and supplier or vendor industrial-base matters. The reduced government-support requirement also reflects preparation for the transition to sustainment after the final production contract.

System Technical Support (STS) provides contractor engineering and logistics assistance to the program office, vehicles, and Soldiers in the field. Its FY 2027 work includes integrating hardware modification kits, provisioning and sourcing material solutions or changes, and correcting system technical and provisioning data, technical manuals, and Interactive Electronic Technical Manuals (IETMs). The contract also supplies emergency field support when essential to mission accomplishment. Its scope decreases as engineering and logistics requirements shift from vehicle production to the end of production and fielding.

Fielding and Support Equipment activities remain distinct parts of the FY 2027 request. Initial spares and repair parts provide material support for vehicles entering service, while support and handling equipment and maintenance equipment support their receipt and upkeep. Contractor logistics support oversight remains funded alongside these fielding needs. The request is assigned to the Army in the secondary distribution; earlier procurement was distributed between the Army and Army National Guard.

The budget justification identifies PIM as necessary for active and reserve components undertaking homeland defense, domestic emergency response, and military support to civil authorities, consistent with Section 1815 of the FY 2008 National Defense Authorization Act. It also explicitly corrects the resource summary's cost-to-complete quantity: the proper figure is 158 sets, to be reflected in a later budget submission. That correction is relevant to the remaining path toward the acquisition objective, while the FY 2027 activities concentrate on oversight, technical assistance, and support for fielded vehicles.

Budget Trend

Paladin Integrated Management (PIM) Procurement Programs (2073GZ0410) budget history and request


Interactive stacked bar chart for exploring the Paladin Integrated Management (PIM) budget
Interactive line chart for exploring the Paladin Integrated Management (PIM) budget
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested Forecasted Forecasted Forecasted Forecasted
$199,477,000 $247,400,000 $273,850,000 $584,089,000 $772,149,000 $525,902,000 $553,425,000 $463,425,000 $662,900,000 $1,009,489,000 $742,349,000 $1,328,960,000 $965,238,000 $84,193,000 $0 $0 $0 $0

Interactive stacked bar chart for exploring the Paladin Integrated Management (PIM) procurement
Interactive line chart for exploring the Paladin Integrated Management (PIM) procurement
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested Forecasted Forecasted Forecasted Forecasted
8 18 30 0 73 51 96 31 43 46 57 60 50 0 0 0 0 0
Download

FY2027 Defense Budget Detail

Loading
Loading