Search Defense Budget

MQ-4C Triton

Category: RDT&E • Line Item: 0305220N • FY26 Budget Request: $14.4M

Overview

Budget Account
1319N - Research, Development, Test and Evaluation, Navy
Budget Activity
07 - Operational system development
Previous Year
Description

The MQ-4C Triton program, as detailed in Program Element (PE) 0305220N, is a Navy initiative focused on the research, development, test, and evaluation (RDT&E) of a high altitude, long endurance unmanned air system (UAS) designed to provide persistent maritime Intelligence, Surveillance, Reconnaissance, and Targeting (ISR&T) capabilities. The primary goal of the program is to deliver comprehensive maritime domain awareness to Fleet and combatant commanders, supporting the Navy's strategic vision for 21st-century operations across the world's high-density sea lanes, littorals, and areas of national interest.

Within PE 0305220N, the MQ-4C Triton Baseline (Project Unit 4020) specifically supports ongoing developmental efforts that began at the program's inception. The objectives under this line item include funding Full Scale Fatigue Testing (FSFT) of the air vehicle, conducting Effects of Defects (EoD) testing, and performing stress analysis to verify and validate fatigue and damage tolerance requirements as outlined in the Performance Based System Specification (PBSS). These activities are critical for certifying the airframe to its intended service life, ensuring the long-term reliability and safety of the platform.

Another key objective of the MQ-4C Triton Baseline is to implement improvements in air vehicle reliability, availability, maintainability, and performance. The FY 2026 funding supports continued airframe fatigue testing and analysis, as well as post-test teardown, inspections, and reporting for specific components such as the outboard ruddervator and nose landing gear. The budget also provides for the execution of EoD testing to address limitations from non-blueprint products and supports enhancements to other aircraft components, including the engine and avionics systems.

The Integrated Logistics Support (ILS), Support, Studies & Analysis component of the program focuses on ensuring the sustainment and supportability of the MQ-4C Triton system. This includes ongoing logistics support, logistics supportability analyses, environmental planning, and the development of technical data necessary for fielding and maintaining the UAS. These efforts are essential to ensure that the system can be effectively integrated into the Fleet and maintained throughout its operational life.

The Test & Evaluation (T&E) portion of the budget is dedicated to supporting developmental testing, particularly related to fatigue testing of the airframe. This ensures that all modifications and upgrades are thoroughly evaluated for performance and safety before being fielded. The T&E activities are managed by the Naval Air Warfare Center Aircraft Division (NAWC-AD) at Patuxent River, MD, and are integral to the program's risk reduction and certification processes.

Program Management (PM) funding supports the administrative and oversight functions necessary for the successful execution of the MQ-4C Triton program. This includes program management support, travel, development of acquisition documentation, capability refinement, open systems architecture development, resource justification, affordability assessments, risk management, system integration planning, technology maturity reviews, and program protection planning. These activities ensure the program remains on schedule, within budget, and aligned with Navy requirements and broader Department of Defense objectives.

The MQ-4C Triton RDT&E line item is structured to ensure the continued development, testing, and fielding of a robust maritime ISR&T capability. The program leverages efficiencies with the Maritime Patrol and Reconnaissance Force and is closely integrated with the P-8A Poseidon to provide a comprehensive family of systems for maritime domain awareness. The incremental development approach, including the transition from Increment 1 Multi-INT capabilities to Increment 2 enhancements, ensures that the Triton system remains technologically advanced and responsive to evolving operational needs, including advanced radar modes, enhanced SIGINT, improved communications, and increased resilience in contested environments.

Budget Trend

MQ-4C Triton Research Development, Test & Evaluation Programs (0305220N) budget history and request


Interactive stacked bar chart for exploring the MQ-4C Triton budget
Interactive line chart for exploring the MQ-4C Triton budget
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested
$375,235,000 $419,242,000 $237,118,000 $113,606,000 $94,115,000 $13,395,000 $11,784,000 $11,120,000 $13,029,000 $13,893,000 $12,094,000 $14,402,000 $14,421,000

Interactive stacked bar chart for exploring the MQ-4C Triton procurement
Interactive line chart for exploring the MQ-4C Triton procurement
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested
0 0 0 113,606 0 0 0 0 0 0 0 0 0
The DoD did not provide line item forecasts in its FY26 budget request, see the prior year budget for any forecasted years
Download

FY2026 Defense Budget Detail

Loading
Loading
FY2026 Budget Released: 06/30/25