Search Defense Budget

Items Less Than $5M (Eng Spt)

Category: Procurement • Line Item: 9530ML5301 • FY24 Budget Request: $0.0M

Overview

Budget Account
2035A - Other Procurement, Army
Budget Activity
3 - Other support equipment
Description
Items Less Than $5M for Engineering Support under the Army's Other Procurement budget activity, aims to procure Pier Over Decking System-RAIL (PODS-RAIL) and Family of Power Utility Kits (FoPUK). The procurement includes basic ramps and loading docks to provide portable loading ramp capabilities for military and commercial line haul conveyances. These mobile loading ramps expand present dock capacity in strategic locations without new construction, enabling Speed of Assembly and Freedom of Movement of forces at key movement nodes. Additionally, the FoPUK provides modernized equipment for maintenance, repair, and testing of high voltage power transmission lines and medium voltage power generation, supporting Gap#7 Air & Missile Defense and essential electrical power operations.

The specific objectives of the program include enhancing the military's logistical capabilities by providing portable loading ramp facilities for efficient loading and unloading of conveyances at strategic locations. Additionally, the procurement of the Family of Power Utility Kits aims to modernize equipment for maintaining high voltage power transmission lines and medium voltage power generation, ensuring the reliability and safety of electrical power operations crucial for administrative, health services, and logistical support. The program also supports Gap#7 Air & Missile Defense by providing essential electrical power support.
Budget Trend

Items Less Than $5M (Eng Spt) Procurement Programs (9530ML5301) budget history and request


Interactive stacked bar chart for exploring the Items Less Than $5M (Eng Spt) budget
Interactive line chart for exploring the Items Less Than $5M (Eng Spt) budget
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Actual Actual Actual Actual Actual Actual Actual Actual Actual Enacted Requested Forecasted Forecasted Forecasted Forecasted
$5,859,000 $16,072,000 $595,000 $300,000 $0 $2,000,000 $4,128,000 $8,014,000 $0 $4,155,000 $0 $0 $0 $0 $0
Download

FY2024 Defense Budget Detail

Loading
Loading
FY2024 Budget Released: 03/09/23