Background
The Commonwealth of Virginia, through the Department of Corrections and Virginia Correctional Enterprises (VCE), is seeking a qualified contractor to establish a firm-fixed price contract for the removal of an existing air compressor and the installation of a new air compressor system at the VCE Panel Shop located within the Greensville Correctional Center.
The goal is to ensure operational efficiency in the wood finishing shop, which is critical to VCE's mission.
Work Details
The contractor will perform a complete turn-key operation that includes:
1. Disconnecting the existing air compressor and installing a new rotary screw, oil-lubricated air compressor with specifications including: 50 HP motor power, 230 V AC electrical supply, maximum working pressure of 150 PSI, rated airflow of approximately 205–215 CFM at 150 PSI, continuous industrial duty cycle, and integrated air-cooled aftercooler.
2. Installing an integrated refrigerated air dryer sized for full compressor output with automatic or zero-loss drains.
3. Providing microprocessor-based controls with safety protections.
4. Full turnkey installation including delivery, equipment placement, mechanical and electrical installations, startup commissioning, operator orientation, and training.
All labor and materials required for a complete operational system must be included in the bid.
Period of Performance
The work is expected to commence following contract award and completion of a mandatory site visit on January 20, 2026.
The exact duration will be specified in the contract but should align with operational needs.
Place of Performance
The installation will take place at the VCE Panel Shop located at Greensville Correctional Center, 901 Corrections Way, Jarratt, VA 23870.
Bidder Requirements
Bidders must be DSBSD-certified small businesses to qualify for set-aside priority.
Additionally, contractors must provide proof of contractor license, certificate of liability insurance, and W9 prior to commencing work.
All personnel must pass background checks to enter the facility.
The Commonwealth of Virginia, through the Department of Corrections and Virginia Correctional Enterprises (VCE), is seeking a qualified contractor to establish a firm-fixed price contract for the removal of an existing air compressor and the installation of a new air compressor system at the VCE Panel Shop located within the Greensville Correctional Center.
The goal is to ensure operational efficiency in the wood finishing shop, which is critical to VCE's mission.
Work Details
The contractor will perform a complete turn-key operation that includes:
1. Disconnecting the existing air compressor and installing a new rotary screw, oil-lubricated air compressor with specifications including: 50 HP motor power, 230 V AC electrical supply, maximum working pressure of 150 PSI, rated airflow of approximately 205–215 CFM at 150 PSI, continuous industrial duty cycle, and integrated air-cooled aftercooler.
2. Installing an integrated refrigerated air dryer sized for full compressor output with automatic or zero-loss drains.
3. Providing microprocessor-based controls with safety protections.
4. Full turnkey installation including delivery, equipment placement, mechanical and electrical installations, startup commissioning, operator orientation, and training.
All labor and materials required for a complete operational system must be included in the bid.
Period of Performance
The work is expected to commence following contract award and completion of a mandatory site visit on January 20, 2026.
The exact duration will be specified in the contract but should align with operational needs.
Place of Performance
The installation will take place at the VCE Panel Shop located at Greensville Correctional Center, 901 Corrections Way, Jarratt, VA 23870.
Bidder Requirements
Bidders must be DSBSD-certified small businesses to qualify for set-aside priority.
Additionally, contractors must provide proof of contractor license, certificate of liability insurance, and W9 prior to commencing work.
All personnel must pass background checks to enter the facility.
Loading Map
Loading Map
Overview
Opportunity Type
Quick Quote
Opportunity ID
A711VCE:110605
Version
2
Response Deadline
Feb. 23, 2026
Due in 4 Days
Date Posted
Feb. 4, 2026
Last Updated
Feb. 4, 2026
Est. Value Range
Experimental
$50,000 - $150,000
(AI estimate)
Agency Distribution
High
Source
On 2/4/26 Correctional Enterprises in Virginia issued Quick Quote Air compressor system replacement with ID A711VCE:110605 due 2/23/26.
Contacts
Documents
Posted documents for Air compressor system replacement
Classifications
Opportunity Classification
Equipment - Non-Technology
Additional Details
Buyer Name
Patricia Lipscomb
Full Source ID
IV110605