Hickory Area Drainage Maintenance
ID: 923456-26-5-2 • State: Louisiana
Opportunity Assistant
Loading
Description
Background
The St. Tammany Parish Government, under the leadership of Parish President Michael B. Cooper, is issuing a solicitation for the Hickory Area Drainage Maintenance project. The goal of this contract is to improve drainage along specified roads in Pearl River, LA, thereby enhancing road safety and functionality.
This project falls under the classification of Highway, Street and Bridge Construction.
Work Details
The contractor is required to provide all labor, equipment, tools, and materials necessary for drainage improvements by installing drain pipes, catch basins, and improving turning radii along the following roads:
- Blueberry Lp (R06H009)
- E Ridgewood Dr (R06H007)
- Mockingbird Lp (R06H010)
- Silas Thomas Rd (R06H006)
- W Ridgewood Dr (R06H008)
in Pearl River, LA. The project must be completed within 45 calendar days from the issuance of the Notice to Proceed by the Parish. All work must conform to the Louisiana Department of Transportation and Development standards.
Period of Performance
The contract performance period is 45 calendar days from the issuance of the Notice to Proceed.
Place of Performance
The work will be performed on various roads in Pearl River, Louisiana.
Bidder Requirements
Bidders must possess a valid Louisiana Contractor’s License and provide bid security in the form of a bid bond or certified check. They must also comply with all applicable Federal and State laws and municipal ordinances related to construction projects.
The St. Tammany Parish Government, under the leadership of Parish President Michael B. Cooper, is issuing a solicitation for the Hickory Area Drainage Maintenance project. The goal of this contract is to improve drainage along specified roads in Pearl River, LA, thereby enhancing road safety and functionality.
This project falls under the classification of Highway, Street and Bridge Construction.
Work Details
The contractor is required to provide all labor, equipment, tools, and materials necessary for drainage improvements by installing drain pipes, catch basins, and improving turning radii along the following roads:
- Blueberry Lp (R06H009)
- E Ridgewood Dr (R06H007)
- Mockingbird Lp (R06H010)
- Silas Thomas Rd (R06H006)
- W Ridgewood Dr (R06H008)
in Pearl River, LA. The project must be completed within 45 calendar days from the issuance of the Notice to Proceed by the Parish. All work must conform to the Louisiana Department of Transportation and Development standards.
Period of Performance
The contract performance period is 45 calendar days from the issuance of the Notice to Proceed.
Place of Performance
The work will be performed on various roads in Pearl River, Louisiana.
Bidder Requirements
Bidders must possess a valid Louisiana Contractor’s License and provide bid security in the form of a bid bond or certified check. They must also comply with all applicable Federal and State laws and municipal ordinances related to construction projects.
Loading Map
Loading Map
Overview
Opportunity ID
923456-26-5-2
Response Deadline
March 4, 2026
Due in 14 Days
Date Posted
Feb. 4, 2026
Est. Value Range
Experimental
$500,000 - $1,500,000
(AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have an individual page for this opportunity. To find the opportunity, go to the Source website listed above, search for open opportunities, and search the results page for the Opportunity ID. Note that historical opportunities may no longer be available at the source.
On 2/4/26 Non State - St. Tammany Parish Government in Louisiana issued Hickory Area Drainage Maintenance with ID 923456-26-5-2 due 3/4/26.
Contacts
Documents
Posted documents for Hickory Area Drainage Maintenance
Classifications
Additional Details
Section
Purchasing