Search Contract Opportunities

Seymour No. 4 Dam Improvements

ID: DEEP020526CM • State: Connecticut
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
List any requirements necessary to complete this contract
I'd like to anonymously submit a question to the procurement officer(s)
Loading
Real Time Relevant State, Local, and Education Bids from all 50 States
Find Now

Description

Background
The Seymour No. 4 Dam Improvements project is issued by the Energy & Environmental Protection agency. The goal of this contract is to enhance the structural integrity and functionality of the Seymour No. 4 Dam through various construction improvements, ensuring safety and efficiency in water management.

Work Details
The contractor will replace the existing spillway with a concrete drop inlet structure featuring a 48-inch discharge pipe and an energy dissipator at the downstream end. A new 16-inch outlet pipe, controlled by a stainless steel slide gate, will be installed within the drop inlet spillway structure. Additionally, a new valve and extension stem will be installed on the existing low-level outlet upstream of the dam at the bottom of the reservoir.

The scope includes clearing trees from embankments, filling in the downstream slope near the new spillway discharge pipe and energy dissipator, repairing eroded areas on the crest (which will be raised by one foot), and placing riprap on the upstream slope. Furthermore, construction of a 100-foot long auxiliary spillway with a concrete core wall is required, along with clearing trees and stumps from the left dike, topsoiling, and seeding with grass.

Period of Performance
The contract work is scheduled to commence on February 4, 2026, and conclude by March 18, 2026.

Place of Performance
The improvements will take place at Seymour No. 4 Dam.
Loading Map
Loading Map

Overview

Opportunity Type
ITB
Opportunity ID
DEEP020526CM
Response Deadline
March 18, 2026 Due in 33 Days
Date Posted
Feb. 4, 2026
Est. Value Range
Experimental
$1,000,000 - $5,000,000 (AI estimate)
Agency Distribution
High
Source
Source Notes
Source does not have a linkable page for this opportunity. To find the opportunity, go to the Source website listed above and search for the opportunity title.
On 2/4/26 Energy & Environmental Protection in Connecticut issued ITB Seymour No. 4 Dam Improvements with ID DEEP020526CM due 3/18/26.

Contacts

Subscribe to find 500K+ key government decision markers

Free Trial Schedule Demo

Documents

Posted documents for Seymour No. 4 Dam Improvements

Classifications

UNSPSC
95000000 - Land and Buildings and Structures and Thoroughfares

Additional Details

Who Can Respond
All Vendors

Similar Active Opportunities