#Industry QuestionGovernment ResponseDate1Will there be more details on the survivability and armor package for the CTT?Yes. Classified Annex C is referenced in Attachment 0008 - Draft Abbreviated Specification (A-Spec), contains more details on the survivability and is available upon request, with proper credentials; refer to the SAM.gov for a point of contact. 16-Nov-20212Will there be an estimate for number or percentage of CTT getting the armor/survivability package? In past fleets (such as HEMTT or HET), only a percentage of the A-cab are upgraded to the b-cab armor package. Wondering if the PM has gotten this far on the CTT.No, a current estimate is not established; however, it is under development and is anticipated to be a split between soft and armored cabs. 16-Nov-20213Request a copy of the MRAP Capability Production Document (CPD) 1.1.MRAP Capability Production Document (CPD) 1.1 is replaced by the CTT Annex C referenced in Attachment 0008 - Draft A-Spec.16-Nov-20214Our concept is based on 24Volt electrical systems. Would that be allowed?Component level solutions will not be specified by the Government. However, other requirements, such as intervehicle requirements, must still be met. The RPP will contain requirements that must be met. It is at the offeror's discretion to decide if their solution meets those requirements. 16-Nov-20215We can provide cab concepts ballistic and non-ballistic with 2 and 3 seats. Would that match or do you require also 4 or 5 person seating capacity?At this time, the Army's anticipated desired capability is provisioned for a 3rd occupant in the Gunner's Sling for Armored Objective Gunner Protection Kit (OGPK) equipped variant. 16-Nov-20216Which exhaust emission level is required?No specific exhaust emission level is required.16-Nov-2021Common Tactical Truck (CTT) Industry DayIndustry Q&ANOTE: All information on the CTT program, including previous documents posted and the responses to the questions, is SUBJECT TO CHANGEDISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate7Is it acceptable to modify the engine / after treatment system when high sulfur fuels are used?No specific exhaust emission level is required. Engines used in Army vehicles must be compatible with the Army’s fuel use policy.16-Nov-20218Which kW/Ton requirements do we have to calculate with?Section 3.1.5 in Attachment 0008 - Draft A-Spec, details the demand reduction desired characteristic.16-Nov-20219Do you foresee a requirement that in a midlife update the driveline should be exchanged to full electric or other technology?TBD. However, the CTT Family of Vehicles (FoV) is desired to be common with industry to facilitate future technology insertion as they become available.16-Nov-202110Is there a replacement volume estimation per model and timeline of expected fleet entry and fleet build-up?No, not at this time. 16-Nov-202111Is there a financial compensation for the prototypes that are required?The Government is considering a cost cap for rapid prototyping. 16-Nov-202112Will the US-Army perform the maintenance or is outsourcing to civil dealer network also possible?The Government intends to leverage full organic maintenance. 16-Nov-202113Do you require a certain military track record from the parties selected to the CTT process?At this time there is no military track record requirement. Evaluation criteria will be listed in the Request for Prototype Proposal (RPP).16-Nov-2021DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate14Is there a requirement to produce a certain % in weight or cost in the US?No, there is no requirement to produce a certain percentage in weight or cost in the US.16-Nov-202115The selection of OTA prototypes; how does that impact production?The prototype evaluation criteria and the follow-on production success metrics will be identified in the RPP. 16-Nov-202116On Industry Day Slide 19, the ranges provided, are they over a specific GVW?Yes, they are specified over the mission profiles at the load requirements specified in Attachment 0008 - Draft A-Spec.16-Nov-202117Will trailers be included in the scope?No16-Nov-202118NRE section of OTA award. What is the anticipation?TBD. Additional information will be provided in the RPP.16-Nov-202119Refer to Industry Day Slide #13, number of prototypes, there is a drastic difference. What is the Army's vision for prototype award?The Government intends to receive a minimum number of prototypes that represent the most common and/or range of CTT mission roles across the FoV. The RPP will contain the number of prototypes.16-Nov-202120What is the level of Tech Data Rights? TBD. Additional information will be provided in the RPP. 16-Nov-2021DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate21Is there a desire for an improved suspension, as referenced in Att 001Currently the Army's vision is to not include any specific suspension requirements. An offeror can propose components it determines are needed to meet the requirements detailed in Attachment 0008 - Draft A-Spec.16-Nov-202122Is there still a desire / target fuel reduction (5-15% in RFI?)Section 3.1.5 in Attachment 0008 - Draft A-Spec details the demand reduction desired characteristic.16-Nov-202123Small Business Connecting Solutions to CTT: Will the attendee list be posted? Small businesses with highly relevant capabilities would be able to bring solutions more effectively if we are able to contact relevant CTT industry providers.Suggestion: Perhaps NAMC post attendance list to consortium. Yes. Per Attachment 0010 - Industry Day List of Participants, attendees authorizing release of its name, is posted to Sam.gov and NAMC's site: namconsortium.org.16-Nov-202124Leveraging Government RDT&E: Is there interest in leveraging R&D results coming from related Army efforts, such as Robot Combat Vehicle Sustainment (RCVS) and Combat Vehicle Robotics (CoVeR)?TBD. Additional information will be provided in the RPP.16-Nov-202125To what extent will you apply "Buy America"? At the system, sub-system levels?The Buy American Act will not apply to the prototype project.16-Nov-202126"Common" is the key to this program. How will you weight the two aspects of common in evaluation?TBD. Additional information will be provided in the RPP.16-Nov-202127What is the planned transition to production award?The Government may utilize the follow-on OT Authority to enter into production award. 16-Nov-2021DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate28What prototypes are anticipated to demonstrate the possibility of commonality? TBD. Additional information will be provided in the RPP.16-Nov-202129Surprised given their importance that HSI and Armor are Tier 4. Should that not be 'promoted'? Particularly given their impact on design/level of modification. Tier placement does not reflect relative importance.16-Nov-202130Will the powertrain (engine, cooling system) be specified by the Government or will that decision be left up to the prime contractor's?Component level solutions will not be specified by the Government.16-Nov-202131PM HTV should consider a separate, non-classified sessions to discuss survivability and threats in general terms.The Government has a classified CTT Annex C that is available upon request, with proper credentials; refer to the SAM.gov for a point of contact. The Government does not plan to hold a separate session for further discussion on this document.16-Nov-202132Please specify if fire suppression will be part of the b-kit (armor package) Classified Annex C details the current Army desired features for fire suppression.16-Nov-202133Will tire fire, engine, cab, fuel tank, all be part of fire suppression/survivability? TBD. Additional information will be provided in the RPP.16-Nov-202134The replaceable armored cab requires a 3rd man provision. Will this requirement of a 3rd man apply to the soft cab?No16-Nov-2021DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate35Can the Army define the Tier 4 requirement Human Systems Integration (in terms of design impacts)?Section 3.4.11 of Attachment 0008 - Draft A-Spec defines these requirements.16-Nov-202136Where are the requirements for stowage (internal & external defined)?TBD. Additional information will be provided in the RPP.16-Nov-202137Will there be further requirements for OGPK (3rd Seat, ammo stowage, etc.)?Current Army desired capability is provisioned for a 3rd occupant in the Gunner's Sling for Armored OGPK equipped variant. Ammo stowage, etc., are TBD.16-Nov-202138Will you provide the legacy fleet fuel economy?Section 3.1.5 in Attachment 0008 - Draft A-Spec details the current CTT fuel efficiency.16-Nov-202139Where will the proto testing occur? Will contractor support be required?Location is TBD. The current Army vision is that contractor support will be required for Test Incident Report (TIR) / Failure Analysis Corrective Action Report (FACAR) response analysis, maintenance, etc.16-Nov-202140There is a discrepancy in desired cargo payload between the attachments (Attachment 0001 lists 22 Tons and Attachment 0008 lists 22,000 LBS). Please clarify the requirements. Attachment 0008 - Draft A-Spec is correct. 22,000 lbs is the correct payload requirement for the cargo mission role.16-Nov-202141Is the NRE portion of the OTA scope intended to address Tier 4 requirements approach or other topics?TBD. Additional information will be provided in the RPP.16-Nov-2021DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited. #Industry QuestionGovernment ResponseDate42Attachment 0001, CTT capability… Show All