NOTE: All information on the CTT program, including previous documents posted and the responses to the questions, is SUBJECT TO CHANGE

Common Tactical Truck (CTT) Industry Day
Industry Q&A

# Industry Question

Will there be more details on the survivability and armor package for the CTT?

Government Response
Yes. Classified Annex C is referenced in Attachment 0008 - Draft Abbreviated Specification (A-Spec), contains
more details on the survivability and is available upon request, with proper credentials; refer to the SAM.gov
for a point of contact.
16-Nov-2021

Will there be an estimate for number or percentage of CTT getting the armor/survivability
package? In past fleets (such as HEMTT or HET), only a percentage of the A-cab are upgraded to
the b-cab armor package. Wondering if the PM has gotten this far on the CTT.

No, a current estimate is not established; however, it is under development and is anticipated to be a split
between soft and armored cabs.

16-Nov-2021

Request a copy of the MRAP Capability Production Document (CPD) 1.1.

MRAP Capability Production Document (CPD) 1.1 is replaced by the CTT Annex C referenced in Attachment
0008 - Draft A-Spec.

16-Nov-2021

Our concept is based on 24Volt electrical systems. Would that be allowed?

Component level solutions will not be specified by the Government. However, other requirements, such as
intervehicle requirements, must still be met. The RPP will contain requirements that must be met. It is at the
offeror's discretion to decide if their solution meets those requirements.

16-Nov-2021

We can provide cab concepts ballistic and non-ballistic with 2 and 3 seats. Would that match or
do you require also 4 or 5 person seating capacity?

At this time, the Army's anticipated desired capability is provisioned for a 3rd occupant in the Gunner's Sling
for Armored Objective Gunner Protection Kit (OGPK) equipped variant.

16-Nov-2021

Which exhaust emission level is required?

No specific exhaust emission level is required.

16-Nov-2021

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

# Industry Question

Is it acceptable to modify the engine / after treatment system when high sulfur fuels are used?

Government Response
No specific exhaust emission level is required. Engines used in Army vehicles must be compatible with the
Armys fuel use policy.
16-Nov-2021

Which kW/Ton requirements do we have to calculate with?

Section 3.1.5 in Attachment 0008 - Draft A-Spec, details the demand reduction desired characteristic.

16-Nov-2021

Do you foresee a requirement that in a midlife update the driveline should be exchanged to full
electric or other technology?

TBD. However, the CTT Family of Vehicles (FoV) is desired to be common with industry to facilitate future
technology insertion as they become available.

16-Nov-2021

Is there a replacement volume estimation per model and timeline of expected fleet entry and
fleet build-up?

No, not at this time.

16-Nov-2021

Is there a financial compensation for the prototypes that are required?

The Government is considering a cost cap for rapid prototyping.

16-Nov-2021

Will the US-Army perform the maintenance or is outsourcing to civil dealer network also
possible?

The Government intends to leverage full organic maintenance.

16-Nov-2021

Do you require a certain military track record from the parties selected to the CTT process?

At this time there is no military track record requirement. Evaluation criteria will be listed in the Request for
Prototype Proposal (RPP).

16-Nov-2021

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

# Industry Question

Is there a requirement to produce a certain % in weight or cost in the US?

Government Response
No, there is no requirement to produce a certain percentage in weight or cost in the US.
16-Nov-2021

The selection of OTA prototypes; how does that impact production?

The prototype evaluation criteria and the follow-on production success metrics will be identified in the RPP.

16-Nov-2021

On Industry Day Slide 19, the ranges provided, are they over a specific GVW?

Yes, they are specified over the mission profiles at the load requirements specified in Attachment 0008 - Draft
A-Spec.

16-Nov-2021

Will trailers be included in the scope?

16-Nov-2021

NRE section of OTA award. What is the anticipation?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

Refer to Industry Day Slide #13, number of prototypes, there is a drastic difference. What is the
Army's vision for prototype award?

The Government intends to receive a minimum number of prototypes that represent the most common
and/or range of CTT mission roles across the FoV. The RPP will contain the number of prototypes.

16-Nov-2021

What is the level of Tech Data Rights?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

# Industry Question

Is there a desire for an improved suspension, as referenced in Att 001

Government Response
Currently the Army's vision is to not include any specific suspension requirements. An offeror can propose
components it determines are needed to meet the requirements detailed in Attachment 0008 - Draft A-Spec.
16-Nov-2021

Is there still a desire / target fuel reduction (5-15% in RFI?)

Section 3.1.5 in Attachment 0008 - Draft A-Spec details the demand reduction desired characteristic.

16-Nov-2021

Small Business Connecting Solutions to CTT: Will the attendee list be posted? Small businesses
with highly relevant capabilities would be able to bring solutions more effectively if we are able
to contact relevant CTT industry providers.

Yes. Per Attachment 0010 - Industry Day List of Participants, attendees authorizing release of its name, is
posted to Sam.gov and NAMC's site: namconsortium.org.

16-Nov-2021

Suggestion: Perhaps NAMC post attendance list to consortium.
Leveraging Government RDT&E: Is there interest in leveraging R&D results coming from related
Army efforts, such as Robot Combat Vehicle Sustainment (RCVS) and Combat Vehicle Robotics
(CoVeR)?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

To what extent will you apply "Buy America"? At the system, sub-system levels?

The Buy American Act will not apply to the prototype project.

16-Nov-2021

"Common" is the key to this program. How will you weight the two aspects of common in
evaluation?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

What is the planned transition to production award?

The Government may utilize the follow-on OT Authority to enter into production award.

16-Nov-2021

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

# Industry Question

What prototypes are anticipated to demonstrate the possibility of commonality?

Government Response
TBD. Additional information will be provided in the RPP.
16-Nov-2021

Surprised given their importance that HSI and Armor are Tier 4. Should that not be 'promoted'?
Particularly given their impact on design/level of modification.

Tier placement does not reflect relative importance.

16-Nov-2021

Will the powertrain (engine, cooling system) be specified by the Government or will that decision
be left up to the prime contractor's?

Component level solutions will not be specified by the Government.

16-Nov-2021

PM HTV should consider a separate, non-classified sessions to discuss survivability and threats in
general terms.

The Government has a classified CTT Annex C that is available upon request, with proper credentials; refer to
the SAM.gov for a point of contact. The Government does not plan to hold a separate session for further
discussion on this document.

16-Nov-2021

Please specify if fire suppression will be part of the b-kit (armor package)

Classified Annex C details the current Army desired features for fire suppression.

16-Nov-2021

Will tire fire, engine, cab, fuel tank, all be part of fire suppression/survivability?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

The replaceable armored cab requires a 3rd man provision. Will this requirement of a 3rd man
apply to the soft cab?

16-Nov-2021

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

# Industry Question

Can the Army define the Tier 4 requirement Human Systems Integration (in terms of design
impacts)?

Government Response
Section 3.4.11 of Attachment 0008 - Draft A-Spec defines these requirements.
16-Nov-2021

Where are the requirements for stowage (internal & external defined)?

TBD. Additional information will be provided in the RPP.

16-Nov-2021

Will there be further requirements for OGPK (3rd Seat, ammo stowage, etc.)?

Current Army desired capability is provisioned for a 3rd occupant in the Gunner's Sling for Armored OGPK
equipped variant. Ammo stowage, etc., are TBD.

16-Nov-2021

Will you provide the legacy fleet fuel economy?

Section 3.1.5 in Attachment 0008 - Draft A-Spec details the current CTT fuel efficiency.

16-Nov-2021

Where will the proto testing occur? Will contractor support be required?

Location is TBD. The current Army vision is that contractor support will be required for Test Incident Report
(TIR) / Failure Analysis Corrective Action Report (FACAR) response analysis, maintenance, etc.

16-Nov-2021

There is a discrepancy in desired cargo payload between the attachments (Attachment 0001 lists
22 Tons and Attachment 0008 lists 22,000 LBS). Please clarify the requirements.

Attachment 0008 - Draft A-Spec is correct. 22,000 lbs is the correct payload requirement for the cargo mission
role.

16-Nov-2021

Is the NRE portion of the OTA scope