Agenda
Welcome and Opening Remarks
Introductions
Purpose
Rules of Engagement
Requirement Overview
Acquisition Information
Open Forum / Industry Input
Individual One-on-One Meetings (Please sign-up)
4/18/2023Introductions
Government Panel
700 CONS
Ms. Karen Stansbury Procuring Contracting Officer (PCO)
Mr. Andy Jacob Contract Specialist
Ms. Christel Wittmer Admin. CO for KMC Areas
86 CES/CEN
Mr. Thomas Wazulin Technical Advisor for KMC Areas
Mr. Michael Klingel Technical Advisor for KMC Areas
52 CONS
Ms. Danita Urioste Admin. CO for Spangdahlem Areas
4/18/2023Purpose
Teaming with industry to develop an efficient acquisition strategy for the MACC
Provide interested parties an opportunity to gain insight into the MACC requirement of the Government
Provide a forum for industry to present substantial input crucial to the execution of the acquisition strategy
Opportunity for one-on-one discussions with industry concerning customary business practices and methods
4/18/2023Rules of Engagement
Open discussion format - any remarks, explanations, or answers to questions today are general guidance only and do not constitute final acquisition strategy
Only the questions received in writing will receive the official response a combined Q&A will be posted on FBO web site
The Contract Specialist and PCO serve as the only points of contact for all inquiries and information regarding the MACC re-procurement
Please turn off cell phones
4/18/2023Requirement Overview
Execution of a broad range of design-build, sustainment, maintenance, repair, alteration, renovation and minor construction projects to include residential and commercial work
Primary bases/Geographically Separated Units (GSUs) served:
Ramstein Air Base
Vogelweh
Einsiedlerhof
Kapaun Air Station
Landstuhl Military Family Housing
Breitenbach
Pirmasens Husterhoehe
Bann
Spangdahlem Air Base
Buechel
Geilenkirchen Air Base
Suelm Annex & Zemmer Storage Annex
4/18/2023Requirement Overview
Multiple Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts
Once the basic MACC contracts are awarded, actual work performance is accomplished via individual Task Orders (TOs)
Each TO is competed via TO Request for Proposal (TORFP)
Each TORFP identifies the project scope in accordance with:
Work Element 1 - Design-Build Effort
Work Element 2 - Design-Build Effort with Partial Design Provided
Work Element 3 - Construction Effort Only
Variety of multiple trades required in horizontal and vertical construction
The contractor shall furnish all personnel, labor, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of repair, sustainment, alteration, and new construction work
4/18/2023Acquisition Information
Anticipate 10-Year IDIQ contract w/ Option to extend 6-Months
Base Period (15 Jan 2025- 14 Jan 2030)
Option 1 Period (15 Jan 2030- 14 Jan 2035)
6-Months Extension Option Period
NAICS Code: 236220, Commercial & Institutional Bldg. Construction
Total Contract Value Range: $500M - $1B
Firm-Fixed-Price TO Magnitude Range: $15,000 - $10,000,000
Each TORFP will be competed & proposals evaluated
4/18/2023Acquisition Information
Website Information:
- Federal Business Opportunities (FBO): http://www.fbo.gov
- Solicitation Number: TBD
Contact Information:
- Karen Stansbury, email Karen.Stansbury@us.af.mil
Tel. +49-631-536-7999
- Andy Jacob, email Andy.Jacob.de@us.af.mil
Tel. +49-631-536-6210
4/18/2023Discussion Topic 1
TO Proposal Submission Time:
Category 1: Routine Requirement (proposal within 10 working days after the site visit)
Category 2: Urgent Requirement (proposal within 3 working days after the site visit)
Category 3: Emergency Requirement (proposal within 8 hours after the site visit)
Are these time constraints reasonable?
4/18/2023Discussion Topic 2
TOs for Spangdahlem areas:
Any difficulties for bidding on TOs for the Spangdahlem projects?
What can the Government do to promote competition in this areas?
4/18/2023Discussion Topic 3
Draft General Requirements & Provisions:
Any room for improvement or parts require more detail/clarification?
Regarding 3 Work Elements:
1. Design-Build Efforts
2. Design-Build Effort w/ Partial Design Provided
3. Construction Effort Only
Are they clearly written?
4/18/2023Discussion Topic 4
What are the most challenging aspects in doing business with the Government?
What can the Government do to minimize those challenges?
4/18/2023Questions for the Govt.
4/18/2023
14
Show All