Summary
compilation of responses to questions asked during an industry day Q&A session regarding the Linear Ground Detection System (LGDS) fiber optic cable procurement and installation solicitation. Key points include:
- The contractor will be responsible for furnishing the fiber.
- Site information is not currently available but will be provided during the solicitation process.
- The government will handle permits for zoning, permitting, and environmental assessments.
- Detailed documentation requirements discussed during the industry day will be included in the solicitation.
- PMOD guides will not be provided before Phase 1.
- Source selection instructions and criteria will be included in the solicitation.
- The acquisition vehicle for the contract has not been finalized yet.
- Funding is available for the requirement with intentions to fully fund the initial base period award.
Additionally, it is emphasized that all information provided in this post-industry day Q&A is preliminary and subject to change, with final details to be provided in the official solicitation release.