DOCUMENT

2020 Earthwork Industry Day Presentation.pdf

OVERVIEW

Original Source
Contract Opportunity
Related Agency
Date Originally Posted
Feb. 11, 2020, 11:43 a.m.
Type
.pdf
Size
2.71MB
Profiled People
None

DOCUMENT PREVIEW

EXTRACTED TEXT

5 February 2020Charleston District PlacementArea MaintenanceIndustry DayWorking Today to Build a Better Tomorrow 2Working Today to Build a Better TomorrowPurpose of Industry Day•Inform Industry of Upcoming Projects•Answer Questions Regarding Projects•Discuss Proposal Submissions Processes•Develop Successful RelationshipsADDISON LAYFIELD, CONTRACTING OFFICER 3Working Today to Build a Better TomorrowQuestions For Contractors•Timeframe of Solicitations•Solicitation Process•Proposal DevelopmentADDISON LAYFIELD, CONTRACTING OFFICER Hanna Collins, PECivil Engineer5 February 2020Charleston District PlacementArea MaintenanceIndustry DayWorking Today to Build a Better Tomorrow 5Working Today to Build a Better TomorrowCHARLESTON HARBOR POST 45•Authorized: 16 December 2016•Project Partnership Agreement Executed 19 July 2017•Construction Started: 3 March 2018•Entrance Channel Contract 1Awarded: 7 September 2017•Entrance Channel Contract 2Awarded: 26 October 2017•Lower Harbor to WWTAwarded: 19 August 2019•Lower Harbor to HLT Award:Summer 2020 (projected)•Upper Harbor Award:Fall 2020 (projected)Entrance channel: 54’ depthEntrance channel 3-mile extensionSegment 1: 52’ depthSegment 2: 52’ depthSegment 3: 48’ depthWidening in select areas 6Working Today to Build a Better TomorrowCHARLESTON HARBOR PLACEMENT AREAS 7Working Today to Build a Better Tomorrow•Advertise-Jan 2020•ProposalsDue-Mar 2020•Award-April 2020•ROM -$1M -$5M•Site Access: Vehicle/equipment access through Joint Base Charleston (Naval Weapons Station)•Acreage: 300•Spillways: 6•Work Requirements: 3-5’ dike raise, remove/rehab spillway structures•Last Activity: Perimeter and interior ditches created in 2019.FY20 JOINT BASE CHARLESTON DIKING 8Working Today to Build a Better TomorrowFY20 CLOUTER CREEK NORTH CELL DITCHING•Advertise-Mar 2020•Proposals Due -May 2020•Award-July 2020•ROM -$500k -$1.5M•Site Access: Water Only•Acreage: 190•Spillways: 4•Small Business Set Aside•Work Requirements: Create ditches for site drainage•Last Activity: Site pumped into in 2020 9Working Today to Build a Better TomorrowFY21 CLOUTER CREEK NORTH CELL DITCHING (ROUND 2)•Advertise-Mar 2021•Proposals Due -May 2021•Award-July 2021•ROM -$500k -$1.5M•Site Access: Water Only•Acreage: 190•Spillways: 4•Small Business Set Aside•Work Requirements: Create ditches for site drainage•Last Activity: Site pumped into in 2020 10Working Today to Build a Better TomorrowFY21 POST 45 DANIEL ISLAND MIDDLE CELL DIKING•Advertise-May 2021•Proposals Due -July 2021•Award -August 2021•ROM -$5M -$10M•Work Requirements: 5’ dike raise, remove 4 spillway structures, rehab 3 spillways, geotextile fabric placement•Acreage: 197•Site Access: Vehicle access through Daniel Island•Last Activity: Perimeter and interior ditches created in 2020. 11Working Today to Build a Better Tomorrow•Authorized depth: 12 feet•Managed by 3 separate reaches•Little River to WinyahBay•WinyahBay to Charleston•Charleston to Port Royal•Dredge on a 3 year cycle to maintain authorized depths (historically dredged less frequently)•Cutter-Suction dredge•Upland/Open Water, placement. Ongoing management of upland PAsAIWW OPERATIONS & MAINTEANCE 12Working Today to Build a Better TomorrowFY20 AIWW DIKING CHARLESTON TO PORT ROYAL •Advertise-April 2020•Proposals Due -May 2020•Award-June 2020•ROM -$1M -$5M 13Working Today to Build a Better Tomorrow•Location: Ashepoo-CoosawCutoff•Site Access: Water Only•2536 C-P (14 Acres): 3-4’ dike raise, rehab/replace 1 spillway structure•2461 C-P (56 Acres): 3-4’ dike raise, rehab/replace 2 spillway structures•Last Activity: Sites pumped into in April-June 2018FY20 AIWW DIKING CHARLESTON TO PORT ROYAL (1 OF 4) 14Working Today to Build a Better TomorrowFY20 AIWW DIKING CHARLESTON TO PORT ROYAL (2 OF 4)•Location: South Edisto•Site Access: Water Only•2160 C-P (31 Acres): clearing, replace 1 spillway•No recent activity due to spillway failure and excess vegetation 15Working Today to Build a Better TomorrowFY20 AIWW DIKING CHARLESTON TO PORT ROYAL (3 OF 4)•Location: Watts Cut•Site Access: Water Only•1764 C-P (50 Acres): clearing, 600 lf dike repair, replace 1 spillway•1717 C-P (50 Acres): clearing, replace 1 spillway•1820 C-P (19 Acres): 3-4’ dike raise, rehab/replace 1 spillway•No recent activity at 1764 and 1717 sites due to spillway failure and excess vegetation. 1820 was pumped into June 2018 –January 2019 16Working Today to Build a Better TomorrowFY20 AIWW DIKING CHARLESTON TO PORT ROYAL (4 OF 4)•Location: Limehouse•Site Access: Equipment/Vehicle Access through GrimballGates neighborhood•532 C-P (60 Acres): 3000 lf dike repair, replace 2 spillways, rehab/replace 2 spillways•Last Activity: Site pumped in October 2018 -February 2019 17Working Today to Build a Better TomorrowFY20 AIWW DIKING GEORGETOWN TO CHARLESTON•Advertise-July 2020•Proposals Due -August 2020•Award-September 2020•ROM -$1M -$5M 18Working Today to Build a Better TomorrowFY20 AIWW DIKING GEORGETOWN TO CHARLESTON (1 OF 4)•Location: AwendawCreek•Placement Areas: •41 S W-C (77 acres)•13 N W-C (34 acres)•19 N W-C (16 acres)•Site Access: Water Only•Work Requirements: clearing, replace 8 spillway structures•No recent activity 19Working Today to Build a Better TomorrowFY20 AIWW DIKING GEORGETOWN TO CHARLESTON (2 OF 4)•Location: AwendawCreek•Placement Areas: •78 N W-C (34 acres)•106 N W-C (25 acres)•Site Access: Water Only•Work Requirements: clearing, replace 8 spillway structures•No recent activity 20Working Today to Build a Better TomorrowFY20 AIWW DIKING GEORGETOWN TO CHARLESTON (3 OF 4)•Location: AwendawCreek•Placement Areas:•204/225 N W-C (117 acres)•402 N W-C (12 acres)•Site Access: Water Only•Work Requirements: site prep, 3-4’ dike raise, rehab/replace 5 spillways•Recent Activity: Both sites were pumped into in late 2019. 21Working Today to Build a Better TomorrowFY20 AIWW DIKING GEORGETOWN TO CHARLESTON (4 OF 4)•Location: North Santee•Placement Area: 1190 N W-C (71 acres)•Site Access: Water Only•Work Requirements: site prep, 3-4’ dike raise, replace 3 spillways•Last Activity: Site may be pumped in spring 2020 22Working Today to Build a Better TomorrowProject NameAnticipated Advertise DateAnticipated Proposal Due DateAnticipatedAward DateFY20JointBase Charleston DikingJanuary 2020March 2020April 2020FY20 ClouterCreek North Cell DitchingMarch2020May 2020July 2020FY20 AIWW Diking Charleston to PortRoyalApril 2020May 2020June 2020FY20 AIWW Diking Georgetown to CharlestonJuly 2020August 2020September2020FY21 ClouterCreek North Cell DikingMarch2021May 2021July 2021FY21Daniel Island Middle Cell DikingMay 2021July 2021August 2021 23Working Today to Build a Better TomorrowCharlenne Figgins, Chief of the Contracting Office 24Working Today to Build a Better TomorrowAddison Layfield, Civil Works Contracting OfficerAddison.G.Layfield@usace.army.milEvelyn Halliburton, Civil Works Contract SpecialistEvelyn.Halliburton-Shannon@usace.army.milLisa Simmons, Civil Works Branch ChiefLisa.S.Simmons@usace.army.milHenry Wigfall, Special Projects Contracting OfficerHenry.Wigfall@usace.army.milWayne Hiatt, Chief, Small Business OfficeWayne.F.Hiatt@usace.army.milCHARLESTON DISTRICT POINT OF CONTACTS