SECTION 011000

SUMMARY OF WORK

PART 1 - GENERAL

SCOPE

The Contractor must provide all material, labor, tools, plant, supplies, equipment, transportation,
superintendence, temporary construction of every nature, and all other services and facilities
necessary to complete the construction of a postal facility for the Postal Service, including all
incidental work described in the contract documents.

The major scope of work items for this project can be found within the contract documents, on
drawing E0.01.

1. Replace unit substation transformers as indicated on the drawings and per sequence of

construction.

2. Relocate Existing 5KV disconnect switches as indicated on the new work plans.

3. Replace substation controls as indicated on the drawings.

4. Provide phasing plan to minimize the disruption of the facility’s electrical distribution system.

5. Dispose of all demolished materials per USPS, Federal, and local ordinances.

6. Provide testing and commissioning of the electrical distribution system.

7. Train USPS personnel on operation of unit substation controls.

8. Provide coordination drawings of the new electrical distribution system showing equipment

ratings and model numbers

All work shall be in accordance with applicable codes and local regulations that may apply. In case
of conflict in or between the Contract Documents and a governing code or ordinance, the more
stringent standard shall apply.

END OF SECTION

PART 2 – PRODUCTS

NOT USED

PART 3 – EXECUTION

NOT USED

USPS Specification issued: 10/1/2021
CA Last Revised: 2/25/2022

USPS

Date: 2/25/2022

POSTAL SERVICE
FURNISHED EQUIPMENT

011000 Attachment A – Page 1