SOW: ALS-U, IDBL M1 Cryocoolers

Henry P. Alvarez

Release Date: Oct 24 2022 10:29:10 AM PDT

Document Number: AL-1549-6727 Revision: A

Document Status: Released
Document Type: SPECIFICATION
Category Code: AL7801
ALS-U - INSERTION DEVICE BEAMLINES enC
otonmcDNL
ht
ealRlacfRXOIyKtAC22
t2
eocealR

Downloaded by: Martha Gamarano Grausz at October 24, 2022 11:19:34

AL-1549-6727 Rev. A

Doc. Status: Released

Table of Contents

Revision History 3

Approvals 3

Abbreviations and Acronyms 3

1 Applicable Documents 4

Introduction 4

Project Overview 4

2.2 Description of Items 4

2.3 Roles and Responsibilities 5

3 Scope Of Work 5

4 Deliverables and Schedule 7

5 Management 7

Kick-off meeting 7

Reporting/Communication requirements 8

5.3 Documentation requirements 8

5.4 Reviews 9

Control points 9

6 Engineering 10

General engineering requirements 10

7 Fabrication 11

General engineering requirements 11

7.2 Documentation packages 11

8 Shipping 11

9 OSAT 12

10 Quality Assurance 12

10.1 Quality reporting requirements 12

10.1.1

Subcontractor quality program 12

10.1.2 Deviation requests 13

10.1.3 NCR 13

10.2 FATP 13

11 Standards and Codes 14

Advanced Light Source Upgrade Project
Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document
Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.

Downloaded by: Martha Gamarano Grausz at October 24, 2022 11:19:34
enC
otonmcDNL
ht
ealRlacfRXOIyKtAC22
t2
eocealR

AL-1549-6727 Rev. A

Doc. Status: Released

REVISION HISTORY

Rev.
CM Number

Description of Change
Initial Release

APPROVALS

The following individual(s) shall approve this document:

Approver
Elaine DiMasi
Christian Roehrig

Project Role
ALS-U Beamlines System Manager
ALS-U IDBL Control Account Manager

ABBREVIATIONS AND ACRONYMS

Acceptance Criteria List
Advanced Light Source Upgrade
After Receipt of Order
Bill of Materials
Computer-Aided Design
Coherent Scattering and Microscopy
Coordinate System
Experimental Physics and Industrial Control System
Factory Acceptance Test
Factory Acceptance Test Plan
Factory Acceptance Test Plan Report
Final Design Review
Fluctuation and Excitation of Orders in the Nanoscale
High Heat Load Optic
Human Machine Interface
Hold Point
Identification
Insertion Device Beamline
Lawrence Berkeley National Laboratory
Liquid nitrogen
White beam mirror
ALS-U BOM COSMIC
CSYS
EPICS FATP
FATR FLEXON
HHLO HP IDBL
LBNL M1
MAESTRO Microscopic And Electronic Structure Observatory NP NUM
OSAT SI TS
Non Conformance Report
Notification Point
Notice to Proceed
Number
Onsite Acceptance Test
Quality Assurance Program
International System of Units
Statement Of Work
Technical Specification
Witness
enC
otonmcDNL
ht
ealRlacfRXOIyKtAC22
t2
eocealR

Advanced Light Source Upgrade Project
Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document
Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.

Downloaded by: Martha Gamarano Grausz at October 24, 2022 11:19:34

AL-1549-6727 Rev. A

Doc. Status: Released

1 APPLICABLE DOCUMENTS

This section identifies applicable documents that are considered to be a part of this
document. All information contained in an applicable document shall be valid to the full
extent, unless specifically noted within this document.

Title

ALS-U Units Policy and Units Definition
ALS-U supplier quality evaluation survey
ALS-U Build-to-Specification CAD Model and Drawing
Requirements
TS: ALS-U, IDBL M1 Cryocoolers
IDBL, M1 Cryocooler Interface Drawing

Number
AL-1009-9880
AL-1208-0209

Rev. B

AL-1265-6612

AL-1559-9488
AL-1567-1001
A

INTRODUCTION

2.1 Project Overview

ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9
GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense
beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and
broad temporal sensitivity. The ALS facility includes an accelerator complex and photon
delivery system that is capable of providing the foundations for an upgrade that will
achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made
foundation, including conventional facilities and also includes extensive beamlines (up to
40 simultaneously operating beamlines) and instrumentation, an experimental hall,
computing resources, ancillary laboratories, offices, and related infrastructure that will
be heavily utilized in an upgrade scenario.

The ALS will be upgraded with a multibend achromat (MBA) lattice design that will
provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000
times increase in brightness — and will provide a significantly higher fraction of coherent
light in the soft x-ray region than is currently available at ALS.

Any resulting Subcontract will be between the University and the party identified as the
Subcontractor and will be issued under Prime Contract No. DE-AC02-05CH11231
between the University and the United States Government (hereinafter “U.S.
Government”), represented by the Department of Energy (hereinafter “DOE”) for the
management and operation of LBNL and the performance of research and related work.

2.2 Description of Items

The purpose of this SOW is to define the production work required to provide build to
specification cryocoolers in support of the ALS-U project. The required work shall include

Advanced Light Source Upgrade Project
Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document
Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.

Downloaded by: Martha Gamarano Grausz at October 24, 2022 11:19:34
enC
otonmcDNL
ht
ealRlacfRXOIyKtAC22
t2
eocealR

AL-1549-6727 Rev. A

Doc. Status: Released

project management, fabrication, control, shipping, and quality assurance activities, as
set forth in Sections 4 through 10 herein.

The ALS-U project will procure two cryocoolers in Group 1, one for each upgraded IDBL:
COSMIC 7.0.1 and MAESTRO 7.0.2. The project would also like to obtain proposals for
two optional cryocoolers in Group 2, one for each new IDBL: FLEXON 10.0.1 and Tender
8.0.1, as shown in Table 2.1. The selected Subcontractor must provide a technical proposal
for all cryocoolers in Group 1 and must also provide a technical proposal for Group 2
cryocoolers. The selected Subcontractor will carry out the work to fabricate and deliver
the units in Group 1. For Group 2, the Subcontractor will satisfy all reporting,
communication, and documentation requirements, up through approval of the final
design, after which LBNL will retain the option to proceed with fabrication within a time
frame to be agreed on in the Subcontract.

Table 2.1. Cryocoolers in the scope of the Subcontract.

Beamline

Group Unit#

COSMIC 7.0.1
MAESTRO 7.0.2
FLEXON 10.0.1

Tender 8.0.1
2
Nominal photon energy range
[eV]
164 - 2,500
20 - 960
Outboard & inboard: 230 - 1,400
Outboard: 2,100 - 8,000
Inboard: 1,000 – 5,000

Number of
cryocoolers 1
2.3 Roles and Responsibilities

Two individuals will be identified in the awarded contract: a University Procurement
Specialist and a University Technical Representative. The named university personnel are
responsible for the contract administration from award initiation through the receipt and
acceptance of the purchased item.

University Procurement Representative – See subcontract for details.

University Technical Representative – See subcontract for details.

The selected Subcontractor is required to identify a project manager to act as the single
point of contact at the Subcontractor. The project manager interfaces directly with the
University Technical Representative for technical, programmatic, and schedule items.

3 SCOPE OF WORK

In accordance to the technical requirements listed in: AL-1559-9488, the Subcontractor
must supply a recirculating cryocooler, to supply pressurized liquid nitrogen to the HHLO
M1 mirror system. The liquid nitrogen must recirculate from the cryocooler to the HHLO
and back again within a closed cooling loop that is pressurized to a constant value
sufficient to prevent any boiling of the liquid nitrogen under all stated operational