Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 1 Introduction The work includes removing six (6) enclosures equaling 38,263 linear feet (LF) (approximately 7.246 miles) within the Rock Springs Field Office’s area of responsibility for the Bureau of Land Management. The enclosures will be broken into two (2) Bid Schedules. The enclosures are constructed with a mix of material from barbed wire to woven panels along with wood and steel posts. Four (4) of these enclosures consist of steel “A” frame river crossings that will be removed. One (1) of these enclosures consist of wooded river crossings that will be removed. All removed fencing material will become property of the contractor for means of disposal. Specifics for Exclosures: Bid Schedule A Exclosure #1 (Little Colorado Wildlife Protective): There is approximately 7,369 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the requirements in specification section fence removal. The exclosure is estimated to have 4 – 5 post corners, 4 – H braces, mix of barbed and woven wire, and one (1) wooded post for every two (2) steel posts. Exclosure is accessible by all machinery via a two track off Highway 28 west. Exclosure #2 (Gasson): There is approximately 4,619 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the requirements in specification section fence removal. This exclosure is estimated to have 4 – 5 post corners, 4 – large steel “A” frame river crossings (See attachment A), 3 barbed wire upper with woven wire lower, and steel posts. Exclosure is accessible by all machinery with access to each side of the river. Exclosure #3 (Ord Creek): There is approximately 2,348 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 2 requirements in specification section fence removal. This exclosure is estimated to have 6 – 5 post corners, 1 barbed wire upper with woven wire lower, and a mix of wooden and steel posts. Exclosure is accessible by all machinery off Block and Tackle road. Exclosure #4 (Bone Draw): There is approximately 17,004 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the requirements in specification section fence removal. This exclosure is estimated to have 14 – 5 post corners, 3 barbed wire upper with woven wire lower, center fence that splits exclosure removed and steel posts. Exclosure is accessible by all machinery. Bid Schedule B Exclosure #5 (Jack Morrow): There is approximately 4,020 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the requirements in specification section fence removal. This exclosure is estimated to have 4 – 5 post corners, 4 – small steel “A” frame river crossings (See attachment B), 3 barbed wire upper with woven wire lower, one (1) gate and steel posts. Exclosure is accessible by all machinery off County Road 21. Exclosure #6 (Steamboat Mountain Study): There is approximately 2,903 Lineal feet in this exclosure of fence that needs to be removed and disposed according to the requirements in specification section fence removal. This exclosure is estimated to have 4 – 5 post corners, 1 – 3 post corner, 3 barbed wire upper with woven wire lower, two (2) gates and steel posts. Exclosure is accessible by all machinery off County Road 83. Location Please see attached location maps for exclosures. Deliverables Bids will be accepted based on bid schedules A and B consisting of bid items related to each exclosure. All exclosures will be completed under one contract. All work shall follow specifications and drawings. Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 3 Project Contacts Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 4 Attachment A Large “A” Frame Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 5 Attachment B Small “A” Frame Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 6 Location Maps Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 7 Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 8 Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 9 Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 10 Statement of Work: 2021 Rock Springs Field Office – Fence Exclosure Removal Exclosure Removal STATEMENT OF WORK SOW - 11