Dam tunnel and warm water slide gates. Includes replacement of the warm water slide gate system within the primary spillway structure, two bulkheads 170 ft. Below the lake water surface, and four tunnel outlet gates within the tunnel outlet structure at raystown lake dam. The project also involves full reconstruction of joints and concrete repairs within the spillway, including hydro-demolition, installation of waterstops and dowels, placement of shrinkage-compensating concrete, and final sealing of joints. Complicated crane rigging within a confined tower is required due to restricted access and challenging placements, including vertical surfaces, sloped slabs, and slippery or wet areas.
Awardee
Awarding / Funding Agency
Place of Performance
Huntingdon, PA 16652 United States
Pricing
Fixed Price
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Related Opportunity
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 09/05/27 to 10/09/29 and the Potential Award value has increased 2% from $20,999,000 to $21,479,094.
Marine Diving Solutions was awarded
Definitive Contract W912DR24C0032 (W912DR-24-C-0032)
for Raystown Lake Dam Hydraulic Gates Replacement
worth up to $21,479,094
by USACE Baltimore District
in September 2024.
The contract
has a duration of 5 years 1 months and
was awarded
through solicitation Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements
with a Small Business Total set aside
with
NAICS 237990 and
PSC Z2KA
via direct negotiation acquisition procedures with 3 bids received.
DOD Announcements
Aug 2024:
Marine Diving Solutions LLC, Centennial, Colorado, was awarded a $20,999,000 firm-fixed-price contract for replacement and construction of large-scale hydraulic mechanical gates and bulkhead work, crane rigging, and concrete demolition and repair at Raystown Lake Dam. Bids were solicited via the internet with three received. Work will be performed in Huntington, Pennsylvania, with an estimated completion date of Sept. 4, 2027. Fiscal 2023 civil operation and maintenance funds in the amount of $20,999,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Baltimore, Maryland, is the contracting activity (W912DR-24-C-0032).
Status
(Open)
Last Modified 11/14/25
Period of Performance
9/5/24
Start Date
10/9/29
Current End Date
10/9/29
Potential End Date
Obligations
$21.5M
Total Obligated
$21.5M
Current Award
$21.5M
Potential Award
Award Hierarchy
Definitive Contract
W912DR24C0032
Subcontracts
Activity Timeline
Opportunity Lifecycle
Procurement history for W912DR24C0032
Transaction History
Modifications to W912DR24C0032
People
Suggested agency contacts for W912DR24C0032
Competition
Number of Bidders
3
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Performance Based Acquisition
Yes
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
EYRDQ3B3LVN3
Awardee CAGE
71EE4
Agency Detail
Awarding Office
W912DR W2SD ENDIST BALTIMORE
Funding Office
W912DR
Created By
jeffrey.a.mcmaster@usace.army.mil
Last Modified By
michelle.l.mcdowell.usace@nad.su
Approved By
jeffrey.a.mcmaster@usace.army.mil
Legislative
Legislative Mandates
Construction Wage Rate Requirements
Performance District
PA-13
Senators
Robert Casey
John Fetterman
John Fetterman
Representative
John Joyce
Modified: 11/14/25