N6833523C0266
Definitive Contract
Overview
Government Description
SBIR PHASE II
Awardee
Awarding / Funding Agency
Place of Performance
San Leandro, CA 94577 United States
Pricing
Cost Plus Fixed Fee
Set Aside
Small Business Set Aside - Total (SBA)
Extent Competed
Full And Open Competition After Exclusion Of Sources
Est. Average FTE
2
Related Opportunity
None
Analysis Notes
Amendment Since initial award the Potential End Date has been extended from 07/21/25 to 08/30/26.
Enertia Microsystems was awarded
Definitive Contract N6833523C0266 (N68335-23-C-0266)
for Sbir Phase Ii
worth up to $1,193,752
by NAWC Aircraft Division
in September 2023.
The contract
has a duration of 3 years and
was awarded
through SBIR Topic Micro-Electromechanical Gyroscope for Improved Inertial Navigation Systems Performance
with a Small Business Total set aside
with
NAICS 541715 and
PSC AC12
via direct negotiation acquisition procedures with 8 bids received.
As of today, the Definitive Contract has a total reported backlog of $329,026.
SBIR Details
Research Type
Small Business Innovation Research Program (SBIR) Phase II
Title
Precision Auto Calibrated Shell Resonator Gyroscope
Related Solicitation
Abstract
Our goal for this Navy SBIR project is to develop a TRL-7 prototype of the BRG with excellent long-term bias stability and shock and vibration insensitivity that can operate in a military temperature range (-50 80 C) and optionally can operate at very high temperature (200 C) (i.e. bias drift < 0.01 deg/hr, angle random walk < 0.005 deg/sqrt(hr), and scale factor stability < 100 ppm). We will investigate and overcome the factors that affect the bias stability and temperature sensitivities of bias and scale factor that currently limit the performance of the Gen-1 readout-and-control electronics. We also propose to evaluate and enhance the performance of electronic self-calibration and compensation algorithms with BRG-10 prototype that will be ready TA2. We plan to test the bias stability and scale factor stability of the BRG-10 prototypes including the self-calibration and compensation algorithms in the military temperature range (-50-85 C). In TA2, we plan to continue the fabrication of BRG-10 prototypes including a dual-layer vacuum package. We plan to demonstrate excellent Q (>4 million) and ?f (<1 Hz), which are essentially needed for building a navigation-grade gyroscope.
Research Objective
The goal of phase II is to continue the R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II.
Topic Code
N211-012
Agency Tracking Number
N211-012-0393
Solicitation Number
21.1
Contact
Jae Yoong Cho
Status
(Open)
Last Modified 10/9/24
Period of Performance
9/11/23
Start Date
8/30/26
Current End Date
8/30/26
Potential End Date
Obligations and Backlog
$864.7K
Total Obligated
$864.7K
Current Award
$1.2M
Potential Award
$0.0
Funded Backlog
$329.0K
Total Backlog
Award Hierarchy
Definitive Contract
N6833523C0266
Subcontracts
Activity Timeline
Transaction History
Modifications to N6833523C0266
People
Suggested agency contacts for N6833523C0266
Competition
Number of Bidders
8
Solicitation Procedures
Negotiated Proposal/Quote
Evaluated Preference
None
Performance Based Acquisition
Yes
Commercial Item Acquisition
Commercial Item Procedures Not Used
Simplified Procedures for Commercial Items
No
Other Categorizations
Subcontracting Plan
Plan Not Required
Cost Accounting Standards
Exempt
Business Size Determination
Small Business
Defense Program
None
DoD Claimant Code
None
IT Commercial Item Category
Not Applicable
Awardee UEI
MHJEF3H1HNH6
Awardee CAGE
7WB72
Agency Detail
Awarding Office
N68335 NAVAIR WARFARE CTR AIRCRAFT DIV
Funding Office
N00421
Created By
dina.marinelli@navy.mil
Last Modified By
dina.marinelli@navy.mil
Approved By
dina.marinelli@navy.mil
Legislative
Legislative Mandates
None Applicable
Performance District
CA-12
Senators
Dianne Feinstein
Alejandro Padilla
Alejandro Padilla
Representative
Barbara Lee
Modified: 10/9/24