Search Contract Opportunities

Industry Day Notice: Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project, Miami-Dade County, Florida   2

ID: W912EP22Z0034 • Type: Special Notice

Description

Posted: July 21, 2022, 9:12 a.m. EDT

Update: 7/21/2022

Purpose: Posting of the Industry Day Presentation slides, and vendor attendance sheet on 20 July 2022 (Industry Day for Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project)

--------------------------------------------------------------------------------------------------

Update: 7/18/2022

Industry Day Presentation, 20 July 2022 at 2:00pm Eastern time.

Webex Meeting:

Purpose: Industry Day for Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project, Miami-Dade County, Florida

https://usace1.webex.com/meet/james.t.tracy

Webex Audio

US Toll Free: +1-844-800-2712

US Toll +1-669-234-1177

Attendee Access Code: 199 227 9920

-------------------------------------------------------------------------------------------------------------

Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project,

Miami-Dade County, Florida

INDUSTRY DAY

DATE: Wednesday, 20 July 2022

TIME: 2:00pm Eastern Local Time

LOCATION: WebEx Presentation (a link will be posted via amendment prior to the presentation). All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil, Ms. I'sis Hill at isis.s.hill@usace.army.mil, & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 19th of July 2022 by 2:00pm local time. The link to access the industry day presentation will be posted via SAM.gov prior to 20 July 2022. Failure to contact Mr. Sparks, Ms. I'sis Hill & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project, Miami-Dade County, Florida. All interested Offerors are required to access SAM.gov for future updates.

DESCRIPTION OF PROJECT:

The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:

  1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.
  2. A new pump station structure has a total pumping capacity of 1,250 cfs that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.
  3. A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.
  4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station
  5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal.

LOCATION OF PROJECT:

The CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L-29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station.

SPECIFIC PROJECT CHALLENGES:

There is limited access to the project site, and public access must be managed and maintained at all times at the main project access across the existing S-334 spillway structure to U.S. 41 (Tamiami Trail). There is ongoing wideing work being conducted on multiple segments of U.S. 41 (Tamiami Trail). USACE will obtain the appropriate Comprehensive Everglades Restoration Plan Regulation Act (CERPRA) permit from the Florida Department of Environmental Protection (FDEP), however the construction contractor will be responsible for obtaining additional permits from the FDEP and the SFWMD for water use authorization and stormwater discharge during construction. The work will require the simultaneous management of organic excavation and embankment material placement in the wet, within a wetland area. The work will require surface and groundwater management to ensure proper construction occurs per project specifications.

Work will require excavation of muck and blasting of rock and require importing material from off-site to construct the project. The pump station and gated spillway structure will require construction of cofferdams and significant dewatering to maintain a dry working surface on the cofferdams interior for construction of these mass concrete structures. The contractor must be able to provide as-builts of the finished work acceptable to the Government.

ENVIRONMENTAL CONDITIONS:
The contractor is required to remain within the construction limits in order to minimize impacts to wetlands.

PLAN SPECIFICATIONS:
Abbreviated draft plans and summary of work specifications of this project may be provided via amendment prior to the presentation.

ADDITIONAL INFORMATION REQUIRED:

Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil, Ms. I'sis Hill at isis.s.hill@usace.army.mil, & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below:

1. Company Name
2. Point of Contact
3. Company Address
4. Phone Number
5. Email Address
6. Duns Number
7. Cage Code
8. Offeror shall identify their size classification and Small Business Size:

-Large Business

-Small Business

-Small Disadvantage Business

-8(a) Small Business

-HUBZone

-SDVOSB

-WOSB

Your email subject line should be addressed as "Industry Day Request (Company Name) - Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner. The required information is due to Mr. Sparks, Ms. I'sis Hill & Mr. Tracy no later than 19 July 2022 at 2:00pm local time.

Posted: July 18, 2022, 1:22 p.m. EDT
Posted: July 1, 2022, 12:10 p.m. EDT

Overview

Response Deadline
July 19, 2022, 2:00 p.m. EDT Past Due
Posted
July 1, 2022, 12:10 p.m. EDT (updated: July 21, 2022, 9:12 a.m. EDT)
Set Aside
None
Place of Performance
Miami, FL United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
On 7/1/22 USACE Jacksonville District issued Special Notice W912EP22Z0034 for Industry Day Notice: Central Everglades Planning Project (CEPP), South Contract 2A, S-356E Pump Station and S-334E Spillway Project, Miami-Dade County, Florida due 7/19/22.
Primary Contact
Name
DeWayne A. Sparks   Profile
Phone
(904) 232-1626

Secondary Contact

Name
James T. Tracy   Profile
Phone
(904) 232-2107

Documents

Posted documents for Special Notice W912EP22Z0034

Opportunity Lifecycle

Procurement notices related to Special Notice W912EP22Z0034

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W912EP22Z0034

Similar Active Opportunities

Open contract opportunities similar to Special Notice W912EP22Z0034

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT JACKSONVI
FPDS Organization Code
2100-W912EP
Source Organization Code
100221797
Last Updated
Aug. 3, 2022
Last Updated By
isis.s.hill@usace.army.mil
Archive Date
Aug. 4, 2022