Search Contract Opportunities

Indefinite Delivery Indefinite Quantity (IDIQ), Single Award Task Order Contract (SATOC), to support maintenance dredging operations and associated activities spanning from Rocklanding Shoal to Richmond Harbor locks   5

ID: W9123622B5011PLA • Type: Special Notice
Federal + SLED + Forecasts + Task Orders

Find every eligible opportunity from thousands of sources in one powerful platform

Free Trial Schedule Demo

Description

The Corps of Engineers Norfolk District is soliciting comments from the construction community addressing the potential use of a Project Labor Agreement (PLA) for the following large scale construction project: James River Maintenance Dredging located in Virginia.

Project Description: The Norfolk District, U.S. Army Corps of Engineers, is seeking eligible firms capable of performing maintenance dredging by hydraulic cutter-head dredge, in various shoals between Rocklanding Shoal and Richmond Harbor Channel. The James River Federal Navigation project is broken into three-segments that include Lower, Middle and Upper James River Shoals. The Lower James River segment includes Rocklanding and Tribell Shoals. The Middle James River segment includes Goose Hill, Dancing Point to Swann Point, Jordan Point-Harrison Bar Channel to Windmill Point, and City Point channel. The Upper James River segment includes Richmond Deepwater Terminal (RDWT) to Hopewell, RDWT Channel & Berthing Area, Richmond Harbor to RDWT, and Richmond Harbor channels.

From Rocklanding Shoal to RDWT Channel and Berthing area, the Channel is maintained to a required depth of -25 feet Mean Lower Low Water (MLLW). From RDWT Channel and Berthing to Richmond Harbor, the Project is maintained to a required depth of -18 feet MLLW. No widening or other channel framework modifications are proposed at this time. For the entire James River Project, one foot of advance maintenance and one foot of allowable over-depth dredging will be considered as part of the contract dredging pay prism. Advance maintenance dredging will be considered as part of the required pay prism. The maximum dredging pay depth is 27 feet MLLW.

The Lower and Middle James River shoals utilize overboard placement sites in the vicinity of the channels to place dredged material. The Upper James River shoals utilize upland placement sites to place dredged material generated by the project. The dredged material removed from the Upper James River shoals is expected to be placed be placed in one of the designated Upper James River upland placement sites that includes RDWT, Willis Road, Hatcher's Island, Curles Neck, and Jones Neck. Annual maintenance dredging activities are estimated to generate up to approximately 2 MCY of pay volume for the Federal and non-Federal navigation project work.

The Contractor shall be responsible for the following: dredging within the designated areas to the proposed required and allowable pay depths, maintaining an average daily plant production rate of 7,500 cubic yards per day, achieve pumping distances exceeding 10,000 linear feet for material placement, earthwork (spur and containment dike construction and management), discharging the material in the designated Government-furnished placement site. In accordance with the most recent version of Engineering Manual 385-1-1, the proposed IDIQ SATOC will include the requirement to replace spillway structures at several designated Government furnished upland placement sites. In addition, the upland placement sites identified in the statement of work will require earthwork, grubbing, seeding, grading, and other preparatory work to ensure effluent water leaving the designated upland placement site meets State water quality requirements. Communicating with the Port of Virginia maritime users to minimize impacts to vessel traffic, adjacent utilities, and dredging operations will be required.

Construction Time:

The Norfolk District is considering award of a 5-year SATOC IDIQ contract with 3 year base and 2 one-year options (if the Government chooses to exercise the Option Years), with the entire contract award amount not to exceed $50,000,000 over the life of the contract. This office anticipates award of a contract for these services no later around September 2022.

Overview

Response Deadline
May 20, 2022, 10:00 a.m. EDT Past Due
Posted
May 5, 2022, 1:39 p.m. EDT (updated: May 20, 2022, 3:29 p.m. EDT)
Set Aside
None
Place of Performance
VA United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Vehicle Type
Indefinite Delivery Contract
On 5/5/22 USACE Norfolk District issued Special Notice W9123622B5011PLA for Indefinite Delivery Indefinite Quantity (IDIQ), Single Award Task Order Contract (SATOC), to support maintenance dredging operations and associated activities spanning from Rocklanding Shoal to Richmond Harbor locks due 5/20/22.
Primary Contact
Name
Tracey Strawbridge   Profile
Phone
(757) 201-7145

Secondary Contact

Name
Eartha D. Garrett   Profile
Phone
(757) 201-7131

Documents

Posted documents for Special Notice W9123622B5011PLA

Opportunity Lifecycle

Procurement notices related to Special Notice W9123622B5011PLA

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W9123622B5011PLA

Similar Active Opportunities

Open contract opportunities similar to Special Notice W9123622B5011PLA

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NORFOLK
FPDS Organization Code
2100-W91236
Source Organization Code
100221786
Last Updated
June 4, 2022
Last Updated By
stormie.b.wicks@usace.army.mil
Archive Date
June 5, 2022