Search Contract Opportunities

Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir, St. Lucie County, Florida   2

ID: W912EP22Z0023 • Type: Special Notice
Federal + SLED + Forecasts + Task Orders

Find every eligible opportunity from thousands of sources in one powerful platform

Free Trial Schedule Demo

Description

Posted: July 22, 2022, 12:38 p.m. EDT

Update 7/22/2022

Purpose: Posting of the Industry Day Presentation slides and Vendor Roster on 21 July 2022 (Industry Day for Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir, St. Lucie County, Florida).

________________________________________________________________________________________________________

Update: 7/19/2022

Industry Day Presentation, 21 July 2022 at 10:00am Eastern Time

WebEx Meeting:

Purpose: Industry Day for Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir, St. Lucie County, Florida

Meeting Link: https://usace1.webex.com/meet/james.t.tracy

Webex Audio:

US Toll Free: +1-844-800-2712

US Toll: +1-669-234-1177

Attendee Access Code: 199 227 9920

__________________________________________________________________________________________________

Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir , St. Lucie County, Florida

INDUSTRY DAY

DATE: Thursday, 21 July 2022

TIME: 10:00-11:00am Eastern Time

LOCATION: WebEx Presentation (A Slide show will be posted via amendment). All interested parties must contact Deborah Torrence at deborah.d.torrence@usace.army.mil and James Tracy at james.t.tracy@usace.army.mil no later than the 18th of July 2022 by 3:00pm EST. The link to access the industry day presentation will be posted via beta.SAM.gov Failure to contact Deborah Torrence and James Tracy on the above dates may result in your inability to attend the Industry Day for the Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir Project requirement. All interested Offerors are required to access BetaSam.gov for future updates.

DESCRIPTION OF PROJECT: The Scope of Work for this project includes the construction of the following major structures.

  1. One seven foot diameter High Density Polyethylene (HDPE) sag culvert. This structure is encased in concrete under the embankment, runs under the C-24 canal, and connects to an existing pipe at the Stormwater Treatment Area (STA) on the east side of the canal.
  2. One pump station with 650 cfs total capacity with associated intake canal from the C-24 canal.
  3. One combination discharge structure and emergency spillway. This consists of a gated tower with weir openings for emergency use. Normal and emergency discharges are through two 7 foot by seven foot concrete box culverts running under the embankment into a discharge canal to the C-24 canal.
  4. Four 6 foot by 6 foot concrete box culverts to provide access across the seepage canal. The two culverts near the C-24 canal on the north and south also control the water level in the seepage canal with a weir plate.
  5. Two 6 foot diameter HDPE pipes to provide access across the PC-37 canal. One of these culverts also controls the water level in the PC-37 canal.
  6. One fixed weir and one bridge to provide access and water level control for the Raulerson Ditch.

Location of Project

The Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir project is located in St. Lucie County.

Specific Project Challenges

The work will be performed in a rural area of St. Lucie County, Florida approximately 12 miles west of I-95 at Fort Pierce and 20 miles northeast of Okeechobee. The work will require significant surface and groundwater management for the duration of construction to ensure proper construction occurs per project specifications. USACE will obtain the appropriate Comprehensive Everglades Restoration Plan Regulation Act (CERPRA) permit from the Florida Department of Environmental Protection (FDEP), however the construction contractor will be responsible for obtaining additional permits from the FDEP and the SFWMD for water use authorization and stormwater discharge during construction.

Work will require the excavation and processing of several million cubic yards of material to be used as embankment fill. Embankment dam internal drainage features will have very specific criteria and will require importing material from off-site. The full interior and crest of the embankment dam will be covered with soil cement. Aggregate for soil cement will be obtained from off-site sources. The work will also require construction of a cutoff wall that will vary in total height, but is approximately 20 feet above grade to 35 feet below grade.

The gated outlet work structure as well as the inflow pump station will require construction of cofferdams and significant dewatering to maintain a dry working surface on the cofferdams interior for construction of these mass concrete structures.

Environmental Conditions

Contractor is required to remain within the construction limits in order to minimize wetland impacts.

ADDITIONAL INFORMATION REQUIRED:

Provide an email to Deborah Torrence at deborah.d.torrence@usace.army.mil and James Tracy at james.t.tracy@usace.army.mil to include the information listed below:

  1. Your Company Name
  2. Point Of Contact
  3. Company Address
  4. Phone Number
  5. Email Address
  6. Duns Number
  7. Cage Code
  8. Offeror shall identify their size classification and Small Business Size:

_ Large Business

_ Small Business

_Small Disadvantage Business

_ 8(a) Small Business

_ HUBZone

_ SDVOSB

_WOSB

Your email Subject line should be addressed as Industry Day Request (Company Name) - Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir Project in order to ensure all requests are handled in a timely manner. The required information is due in house to Deborah Torrence and James Tracy no later than 18 July 2022 at 3:00pm ET.

Posted: July 19, 2022, 2:53 p.m. EDT
Posted: July 7, 2022, 12:46 p.m. EDT

Overview

Response Deadline
July 18, 2022, 3:00 p.m. EDT Past Due
Posted
July 7, 2022, 12:46 p.m. EDT (updated: July 22, 2022, 12:38 p.m. EDT)
Set Aside
None
Place of Performance
Port Saint Lucie, FL United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
On 7/7/22 USACE Jacksonville District issued Special Notice W912EP22Z0023 for Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-23/C-24 North Reservoir, St. Lucie County, Florida due 7/18/22.
Primary Contact
Name
James T. Tracy   Profile
Phone
(904) 232-2107

Secondary Contact

Name
Deborah Torrence   Profile
Phone
(904) 232-1007

Documents

Posted documents for Special Notice W912EP22Z0023

Opportunity Lifecycle

Procurement notices related to Special Notice W912EP22Z0023

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W912EP22Z0023

Similar Active Opportunities

Open contract opportunities similar to Special Notice W912EP22Z0023

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT JACKSONVI
FPDS Organization Code
2100-W912EP
Source Organization Code
100221797
Last Updated
Aug. 2, 2022
Last Updated By
deborah.d.torrence@usace.army.mil
Archive Date
Aug. 3, 2022