Search Contract Forecasts

REPLACE UNDERGROUND ELECTRICAL WIRINGS FOR WELLS CONNECTED TO AIR OPS-MCC, VARLOCS

Type: Forecast

Overview

Description
The project scope of work includes: 1] Provide temporary power supply to different water wells, connected to Air Ops Water Wells; 2] remove and replace existing underground THHN wires with XHHW-2 wire specification connected from Air Ops water wells (AO-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26) SCADA Control Panel and pumps up to MCC located at F-309; 3] Perform Insulation Resistance testing and validate if resistance pass the minimum requirement; 4] Perform dry run testing of all pumps.
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q2 2026
Source Est. Solicitation Date
Q2 2026
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
TBD,
Forecast Source
Naval Facilities Engineering Command
Naval Facilities Engineering Command is forecasted to issue a new procurement for REPLACE UNDERGROUND ELECTRICAL WIRINGS FOR WELLS CONNECTED TO AIR OPS-MCC, VARLOCS around Q2 2026 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Far East
Source Level 3 Agency
N62742

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/8/24
Date Modified
6/8/24
Additional Notes
MAC - General and RFP - LP