Replace 24 inch Main Transmission line, Apra Height Reservoir to Valve vault B-1-S-V8
Type: Forecast
Overview
Description
Replace existing 24 inch Cast Iron pipe water line approximately 12,700 linear foot running from Apra Heights Reservoir ( Bldg. 4180) to valve Vault, B-1-SV8 along Route 2A Agat Drive and Route 5 Magazine Road with new 24 Fusible Polyvinyl Chloride (FPVC) water distribution line with associated fittings/transition fittings, thrust blocks, combination air/vacuum relief valve, lateral valves, by pass piping/valves and appurtenance as required by the design in accordance with UFC and NFM Public Works utilities Criteria. Provide other appurtenance required to ensure complete and usable system.
Est. Value
Min: $7,500,000
Max: $50,000,000
Max: $50,000,000
Est. Award Date
Q3 2026
Source Est. Solicitation Date
Q3 2026
Set Aside
Small Business Set-Aside
Pricing
Fixed-Price
Procurement Method
Delivery Order/Task Order (not under Federal Supply Schedule Contract)
Forecast Type
New
Place of Performance
USA
Forecast Source
Naval Facilities Engineering Command
NAVFAC Marianas is forecasted to issue a new procurement for Replace 24 inch Main Transmission line, Apra Height Reservoir to Valve vault B-1-S-V8 around Q3 2026 worth up to $50,000,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC Marianas
Source Level 3 Agency
N40192
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
12/22/25
Additional Notes
MAC - SB and RFP - LP