"Scope of Works: Project will perform the following.
ISLAND ROOM :(1.) Replace carpet at island room, and the tiles at the bar, dance floor , green and storage room(2). Replace ceiling with black color at the island room and to match existing at the green and storage rooms (3.) Repaint entire space including wainscoting with new artwork in selected locations (4.) Enlarge the dance floor area (5.) Demolish and rebuild the bar to approx half it size; include removal of trellis and cabinets, replace foot and grab rail, affecte plumbing and electrical works. (6.) Demo/Rebuild the performance stage to existing dimensions and add built in storage area under stage (7.) Replace doors and storge shelivng at the green and storage rooms. (8). Replace the current lighting system with LED lights/switches including in storage area, (9.) Add additional POS drops to bar (10) Provide new dining seating furniture .
FOODCOURT:(1.) Repaint entire space with new art work at selected locations (2.) Replace ceiling (3). Increase the length of the range hood and ANSEL system (4.) Provide/Install a new deep fat fryer Inc. any electrical upgrades necessary (5). Replace the current lighting system with LED lights/switches (6.) Install a new continuous front counter to match existing sectional counter (7.) Replace the wall tiles behind service counter with wood panels (8.) Replace floor tiles at the serving area (9.) Add POS drops to counter (10.) Remove pony walls & dining partitions (11.) Provide new dining seating furniture inc. tables, chairs, possible counter height seating with electrical and usb outlets.
RESTROOMS:1. Replace wall and floor tiles (2) replace toilet partitions and doors (3.) repaint gypsum ceiling (4) replace plumbing fixtures, vanity sinks and counters. (5). New LED Lighting fixtures (lights/switches) (6). New accesso ...
NOTE: description has been truncated, please see Project Note for full description.
Est. Value
Min: $2,000,000
Max: $7,500,000
Max: $7,500,000
Est. Award Date
Q3 2026
Source Est. Solicitation Date
Q3 2026
Set Aside
TBD
Pricing
Fixed-Price
Procurement Method
Delivery Order/Task Order (not under Federal Supply Schedule Contract)
Forecast Type
New
Place of Performance
USA
Forecast Source
Naval Facilities Engineering Command
NAVFAC Far East is forecasted to issue a new procurement for RENOVATE TURNER CLUB - F-110 around Q3 2026 worth up to $7,500,000.
Agency
Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC Far East
Source Level 3 Agency
N40084
Contacts
Potential Bidders and Partners
Similar Active Opportunities
Additional Detail
Date Published
12/22/25
Additional Notes
MAC - General and RFP - LP