(DBB-AE) KIC Lab Renovation B12, Keyport (22817435)

Type: Forecast

Overview

Description
Summary - This design effort will enable the Keyport Innovation Center (KIC) to be relocated to B12 Rm 141, a much larger and versatile space. This move will eliminate issues such as space constraint, accessibility, and allow room for growth that are currently problematic in their existing space. This project will be NISE funded with Design-Bid-Build (DBB) effort planned to begin in FY24 design and construction programmed for FY25. A. Architectural Considerations 1. Work stations for KIC Lab personnel quantity to be identified 2. Restrooms Men's and Woman's 3. Wash down sink with tempered water 4. Large Entry to be able to move equipment in and out of the KIC (60 x84 ) 5. Storage areas: a. Equipment not in use b. Materials c. Hazmat and Chem lockers d. Lithium Battery Locker e. Lockable Storage space for materials and equipment f. Miscellaneous Storage g. Lockers for Projects 6. Isolate space from the rest of the building to be able to secure and maintain ventilation control. 7. Sound dampening to prevent Echo 8. Collaboration Suite with configurable tables and chairs 9. Solid floor for easy cleaning 10. Waste Collection area: Solid and Water/Liquid waste 11. Emergency Eyewash Station 12. Hotel locations for users (with power and network) B. HVAC/Mechanical Considerations 1. Comfort heating and cooling with Humidity Control 2. Adequate Ventilation for 3d printing resin and resin cleaning products 3. Specialty ventilation: laser engraver, soldering and electrical test benches 4. Vacuum System for CNC/Milling 5. Supply/waste/Vent for restrooms and wash sink 6. Available Compressed Air - LP C. Electrical Considerations The Facility must have adequate power to support all equipment: i. 6 smal ... NOTE: description has been truncated, please see Project Note for full description.
Est. Value
Min: $2,000,000
Max: $7,500,000
Est. Award Date
Q3 2025
Source Est. Solicitation Date
Q3 2025
Set Aside
TBD
Pricing
Fixed-Price
Forecast Type
New
Place of Performance
NW: BANGOR PDC,
Naval Facilities Engineering Command is forecasted to issue a new procurement for (DBB-AE) KIC Lab Renovation B12, Keyport (22817435) around Q3 2025 worth up to $7,500,000.

Agency

Source Level 1 Agency
Naval Facilities Engineering Command
Source Level 2 Agency
NAVFAC SYSCOM Northwest
Source Level 3 Agency
N44225

Contacts

Point of Contact
NAVFAC OSBP   Profile
Point of Contact Email

Potential Bidders and Partners

Similar Active Opportunities

Additional Detail

Date Published
6/8/24
Date Modified
6/8/24
Additional Notes
MAC - General and RFP - BVSS (Two Step)